UK Oil & Gas PLC (London AIM: UKOG) has made an announcement regarding the temporary suspension of testing operations in collaboration with Aladdin Middle East, the operator of Pinarova-1.
UK Oil & Gas PLC (London AIM: UKOG) has made an announcement regarding the temporary suspension of testing operations in collaboration with Aladdin Middle East, the operator of Pinarova-1.
Angus Energy (AIM: ANGS) announce that, as planned, the second compressor at Saltfleetby Field was successfully commissioned in dual compressor mode on 10th May and the 3 producing wells in
UK Oil & Gas PLC (AIM: UKOG) is delighted to report that drilling at Pinarova-1 has reached its final depth of 600 meters below the surface. Electric logs have been
Angus Energy (AIM: ANGS) report the successful commissioning of the newly drilled B7T sidetrack well at the Saltfleetby Field earlier today. A temporary flowline connects the well to the Saltfleetby
UK Oil & Gas PLC (London AIM: UKOG) is pleased to announce that following completion of an initial 107 metre open hole swab test over the uppermost Hoya limestones, Pinarova-1’s
UK Oil & Gas PLC (London AIM: UKOG) is pleased to announce that after drilling ahead within the target Eocene Hoya limestone sequence, Pinarova-1 encountered oil shows in drill cuttings
Further to the announcement of 2 March 2023 and Angus’s vision of becoming a significant player in the aggregation, production and storage of gas, the Company is pleased to finalise
UK Oil & Gas PLC (London AIM: UKOG) has made an announcement regarding the progress of Pinarova-1 drilling operations. The 9⅝ inch casing has been successfully set and cemented at
Angus Energy (AIM: ANGS) Angus is pleased to announce the completion of the initial clean up of the new B7T well at Saltfleetby.
UK Oil & Gas PLC (London AIM: UKOG) is pleased to announce that Pinarova-1 has now reached its planned 9⅝ inch casing point at 291 metres below the surface, several
UK Oil & Gas PLC (London AIM: UKOG) is pleased to announce that Pinarova-1 drilling operations commenced at 0800 local time on Friday 7th April, 2023. Drilling of 12¼ inch