(Corallian Energy Limited) that the sidetrack well 98/11a-6Z has encountered the top of the Sherwood Sandstone reservoir below the level of the 98/11-3 oil water contact and did not penetrate
(Corallian Energy Limited) that the sidetrack well 98/11a-6Z has encountered the top of the Sherwood Sandstone reservoir below the level of the 98/11-3 oil water contact and did not penetrate
A CONTROVERSIAL oil rig has arrived ahead of drilling in Poole Bay.
Drilling has started on an exploration well in the Moray Firth, believed to hold up to 26million barrels of oil equivalent.
An energy firm plans to drill a well more than 1,000m (3,280ft) below the seabed in Poole Bay in a bid to explore oil reserves.
Poole Bay oil rig coming this Winter at the earliest as regulator looks at the impact on salmon