{"id":126027,"title":"Wishbone Gold PLC (AIM: WSBN, AQSE: WSBN) Breccia Pipe Intersected at Red Setter Project","publisher":"Share Talk","author":"sharetalk","published":"2025-08-18T07:36:31+00:00","modified":"2026-06-22T02:07:41+00:00","canonical_url":"https://www.share-talk.com/wishbone-gold-plc-aim-wsbn-aqse-wsbn-breccia-pipe-intersected-at-red-setter-project/","markdown_url":"https://www.share-talk.com/wishbone-gold-plc-aim-wsbn-aqse-wsbn-breccia-pipe-intersected-at-red-setter-project.md","json_url":"https://www.share-talk.com/wishbone-gold-plc-aim-wsbn-aqse-wsbn-breccia-pipe-intersected-at-red-setter-project.json","category":"Mining","categories":["Mining"],"tags":["Australia","David Hutchins","Edward Mead","Gold","Gold Index","Havieron","Patersons Range","Queensland","Red Setter","Red Setter Exploration","Richard Poulden","Telfer Region","Terra Search","Western Australia","Wishbone Gold","WSBN"],"featured_image":"https://i0.wp.com/www.share-talk.com/wp-content/uploads/2025/08/wsbn-18-aug.webp?fit=1200%2C800&quality=80&ssl=1","format":"news","language":"en-GB","content":"**Significant Breccia Pipe Intersected at Red Setter Gold Project in Western Australia**\n\n**Over 130 metres of Breccia with Sulphides Intersected from 570 metres**\n\n**Wishbone Gold Plc** is pleased to announce that drilling at the Company’s Red Setter Gold Dome Project, located 15km South West of **Greatland Gold Plc’s (AIM and ASX: GGP)** Telfer gold mine in Western Australia (Figure 1), has drilled into the top of a significant breccia pipe with its first hole of this drill program (Figures 2-8). Zones of quartz-carbonate veining and sulphides of chalcopyrite and pyrite were observed from 520m, with increasing intensity towards ~570m. Variable intensity of brecciation has been observed over an interval of more than 130m from ~570m, to current depth of ~700m with drilling still continuing as of this release.\n\nThe drill plan for this hole (hole number 25RSDD001) is to now continue down to total depth of ~750m, and then potentially drill deeper later on in this program, when additional drill pipe is mobilised to site by the drilling contractor.\n\nTransport of the core to Perth to be cut and assayed will now be expedited.\n\nAs announced on 25 April 2025 the Mobile MT domal target interpreted by Expert Geophysics Limited (EGL), showed the original top of target depth at around 550m.\n\nOn completion of the current drill hole, a step out hole will be collared from surface to the south-west of the current hole aimed at assessing the lateral extent of this breccia zone. The step out drill hole will be targeting around 50m to 75m distance from the current down hole position at a depth of 550m.\n\n**Ed Mead, Wishbone Gold WA director, commented:** “It is outstanding to see the emergence of this mineralised breccia pipe and see the intensity of brecciation and the amount of quartz-carbonate veining and sulphides. This is a fantastic outcome as brecciation typifies a style of gold and copper mineralisation seen at both the nearby Telfer and Havieron deposits. Transportation of the core to Perth to be cut and assayed is a priority. We look forward to updating shareholders as we further test this exciting target.”\n\n![](https://dw6uz0omxro53.cloudfront.net/3480405/98963ca9-39d5-4af0-aae0-52ebe74d6df2.jpg)\n\nFigure 1: WSBN Exploration Tenement applications immediately surrounding the Telfer Mine.\n\n![](https://dw6uz0omxro53.cloudfront.net/3480405/a67d3010-d585-46bb-8b21-6f9348ebfa31.jpg)\n\nFigure 2: Breccia started at ~570 metre with chalcopyrite and pyrite sulphides, Core from ~575-579m.\n\n![](https://dw6uz0omxro53.cloudfront.net/3480405/d7d71a02-2829-4b6a-8fd0-3ace1cbf3643.jpg)\n\nFigure 3: Breccia with chalcopyrite and pyrite sulphides from ~605-610m.\n\n![](https://dw6uz0omxro53.cloudfront.net/3480405/e4a283e3-dbad-4f8b-96ba-b4f45b7983e5.jpg)![](https://dw6uz0omxro53.cloudfront.net/3480405/003607eb-7e15-49f1-a939-d5f380602cb9.jpg)\n\nFigure 4: Breccia including chalcopyrite and pyrite sulphides at around 619-623m\n\n![](https://dw6uz0omxro53.cloudfront.net/3480405/7415f9f9-7257-42bc-abad-b0174ec9c8dc.jpg)![](https://dw6uz0omxro53.cloudfront.net/3480405/2474df37-745c-421f-b5e7-7dca366356ec.jpg)\n\nFigure 5: Breccia including chalcopyrite and pyrite sulphides at around 627-632m.\n\n![](https://dw6uz0omxro53.cloudfront.net/3480405/4e183c7f-688e-4f68-87e9-663671062526.jpg) ![](https://dw6uz0omxro53.cloudfront.net/3480405/bbf33a43-f6b5-41b6-b25d-9f604e38f460.jpg)\n\nFigure 6: Breccia including chalcopyrite and pyrite sulphides at around 642-646m.\n\n![](https://dw6uz0omxro53.cloudfront.net/3480405/0e81533b-67a1-472c-bd05-799d61d09c05.jpg) ![](https://dw6uz0omxro53.cloudfront.net/3480405/d487d56e-60da-42f5-b15c-516678aaef0d.jpg)\n\nFigure 7: Quartz carbonate veining, breccia including chalcopyrite and pyrite sulphides at around 690-700m.\n\n![](https://www.share-talk.com/wp-content/uploads/2025/08/Breccia-Pipe-Intersected-at-Red-Setter-Project-_-Company-Announcement-_-Inv.-2025-08-18-at-8.48.01-AM-208x300.webp)\n\nFigure 8: Selection of Breccia core intercepts from 570m to 650m.\n\nEND\n\nFor more information on Wishbone, please visit the Company’s website.\n\n[www.wishbonegold.com](http://www.wishbonegold.com/).\n\nFor further information, please contact:\n\n|   |   |\n| --- | --- |\n| Wishbone Gold PLC |  |\n|   Richard Poulden, Chairman |   Tel: +971 4 584 6284 |"}