---
title: "Wishbone Gold – Drilling Operations Commence at Red Setter Gold Dome Project Western Australia"
publisher: "Share Talk"
author: "sharetalk"
published: "2025-07-21T10:08:16+00:00"
modified: "2025-07-21T10:08:16+00:00"
date: 2025-07-21
canonical: "https://www.share-talk.com/wishbone-gold-drilling-operations-commence-at-red-setter-gold-dome-project-western-australia/"
category: "Mining"
categories: ["Mining"]
tags: ["Australia", "David Hutchins", "Edward Mead", "Gold", "Gold Index", "Havieron", "Patersons Range", "Queensland", "Red Setter", "Red Setter Exploration", "Richard Poulden", "Telfer Region", "Terra Search", "Western Australia", "Wishbone Gold", "WSBN"]
image: "https://i0.wp.com/www.share-talk.com/wp-content/uploads/2025/07/0e7b10e6-3872-415a-af1f-53151e03df0d.webp?fit=550%2C412&quality=80&ssl=1"
format: "news"
language: "en-GB"
---

# Wishbone Gold – Drilling Operations Commence at Red Setter Gold Dome Project Western Australia

**Published:** July 21, 2025
**Author:** sharetalk
**Categories:** Mining
**Tags:** Australia, David Hutchins, Edward Mead, Gold, Gold Index, Havieron, Patersons Range, Queensland, Red Setter, Red Setter Exploration, Richard Poulden, Telfer Region, Terra Search, Western Australia, Wishbone Gold, WSBN
**Featured image:** ![](https://i0.wp.com/www.share-talk.com/wp-content/uploads/2025/07/0e7b10e6-3872-415a-af1f-53151e03df0d.webp?fit=550%2C412&quality=80&ssl=1)

---

**Wishbone Gold Plc** is pleased to announce that the contract drillers have successfully mobilised to the Company’s Red Setter Gold Dome Project, located about 15km SW of Greatland Gold Plc’s (AIM and ASX: GGP) operating Telfer gold mine in Western Australia. (Refer to Figure 2 for location)

**Ed Mead, Wishbone Gold WA director, commented;** “ Access routes have now been opened, and the drillers have mobilised to site and established the necessary site works to drill. As of yesterday, the rig was over the first of two drill holes that are to be deepened from around 300m depth down to around 550m target depth and had successfully run casing to near the bottom of the first hole. We expect further drilling towards the new target depths in the days ahead. “

![A truck and a crane in a field AI-generated content may be incorrect.](https://dw6uz0omxro53.cloudfront.net/3454308/0e7b10e6-3872-415a-af1f-53151e03df0d.jpg)

Figure 1: Drillers on site at Red Setter preparing to deepen previous drilled RC hole to target depth of 550m.

![](https://dw6uz0omxro53.cloudfront.net/3454308/e8842e81-0bcf-4343-9e6d-3d8f336a675e.jpg)

Figure 2: WSBN Exploration Tenement applications immediately surrounding the Telfer Mine.

END

For more information on Wishbone, please visit the Company’s website.

[www.wishbonegold.com](http://www.wishbonegold.com/).

For further information, please contact:

|   |   |
| --- | --- |
| Wishbone Gold PLC |  |
|   Richard Poulden, Chairman |   Tel: +971 4 584 6284 |

---

**Original URL:** https://www.share-talk.com/wishbone-gold-drilling-operations-commence-at-red-setter-gold-dome-project-western-australia/
*Created by [WP Markdown Endpoint](https://wpmarkdownendpoint.com/)*
