{"id":113034,"title":"Touchstone Exploration Increases Loan Capacity as 2024 Oil Well Drilling Progresses","publisher":"Share Talk","author":"sharetalk","published":"2024-03-04T08:27:23+00:00","modified":"2024-03-04T08:27:23+00:00","canonical_url":"https://www.share-talk.com/touchstone-exploration-increases-loan-capacity-as-2024-oil-well-drilling-progresses/","markdown_url":"https://www.share-talk.com/touchstone-exploration-increases-loan-capacity-as-2024-oil-well-drilling-progresses.md","json_url":"https://www.share-talk.com/touchstone-exploration-increases-loan-capacity-as-2024-oil-well-drilling-progresses.json","category":"Energy","categories":["Energy","Oil and Gas"],"tags":["3D seismic","Cascadura field","data","Heritage Petroleum","James Shipka","Paul Baay","Touchstone Explrtn","Trinidad","TXP"],"featured_image":"https://i0.wp.com/www.share-talk.com/wp-content/uploads/2024/03/TXP.webp?fit=1200%2C800&quality=80&ssl=1","format":"news","language":"en-GB","content":"**Touchstone Exploration Inc (AIM:TXP, TSX:TXP, OTC:PBEGF)** has notably increased its financial leverage to initiate the next phase of drilling at the prolific Cascadura field in Trinidad.\n\nThe company [informed stakeholders](https://www.londonstockexchange.com/news-article/TXP/expanded-bank-debt-and-drilling-update/16358924) that its financial capacity has been boosted by approximately $13 million. This enhancement comprises a new $10 million five-year banking loan and a $3 million augmentation of its existing revolving credit facility, which now extends from $7 million to $10 million.\n\nThis financial augmentation is aimed at underpinning the 2024 capital initiative, which encompasses drilling new wells to augment production levels.\n\nTouchstone has also commenced drilling at the Cascadura and CO-1 fields. Current operations include the drilling of the Cascadura-3 and CO-374 wells.\n\nThe CO-374 well, which began drilling on February 28, targets oil-rich sands within the Cruse and Forest formations. The drilling is planned to reach a total depth of 6,600 feet.\n\nThe Cascadura-3 well, initiated on March 1 at the Cascadura C site within the Ortoire block, aims to tap into gas-rich sands in the Herrera formation, situated northeast of the recently drilled Cascadura-2 well. The expected drilling depth for this well is around 7,000 feet.\n\nFurthermore, Touchstone has successfully completed casing the Cascadura-2 well despite encountering challenges due to high gas pressures causing wellbore instability, necessitating a sidetrack of part of the well. Concurrently, the company is focusing on adding necessary infrastructure to connect the Cascadura-2 well to the Cascadura natural gas facility.\n\nAdditionally, Touchstone plans to prepare the Cascadura B site for the drilling of up to four development wells."}