UK Oil & Gas PLC (London AIM: UKOG) has made an announcement regarding the temporary suspension of testing operations in collaboration with Aladdin Middle East, the operator of Pinarova-1.
UK Oil & Gas PLC (London AIM: UKOG) has made an announcement regarding the temporary suspension of testing operations in collaboration with Aladdin Middle East, the operator of Pinarova-1.
UK Oil & Gas PLC (AIM: UKOG) is delighted to report that drilling at Pinarova-1 has reached its final depth of 600 meters below the surface. Electric logs have been
UK Oil & Gas PLC (London AIM: UKOG) is pleased to announce that following completion of an initial 107 metre open hole swab test over the uppermost Hoya limestones, Pinarova-1’s
UK Oil & Gas PLC (London AIM: UKOG) is pleased to announce that after drilling ahead within the target Eocene Hoya limestone sequence, Pinarova-1 encountered oil shows in drill cuttings
UK Oil & Gas PLC (London AIM: UKOG) has made an announcement regarding the progress of Pinarova-1 drilling operations. The 9⅝ inch casing has been successfully set and cemented at
UK Oil & Gas PLC (London AIM: UKOG) is pleased to announce that Pinarova-1 has now reached its planned 9⅝ inch casing point at 291 metres below the surface, several
UK Oil & Gas PLC (London AIM: UKOG) is pleased to announce that Pinarova-1 drilling operations commenced at 0800 local time on Friday 7th April, 2023. Drilling of 12¼ inch
UK Oil & Gas PLC (London AIM: UKOG) is pleased to announce that construction of Pinarova-1’s drilling pad and access road has now been completed. Drilling to a total depth
UK Oil & Gas PLC (London AIM: UKOG) is delighted to announce that its subsidiaries UKOG (137/246) Ltd (UKOG 100% interest) and Horse Hill Developments Ltd (“HHDL”, UKOG 77.9% interest)
UK Oil & Gas PLC (London AIM: UKOG) is pleased to announce that a new Competent Person’s Report (“CPR”) has been completed on the Horndean field (UKOG 10% non-operated interest) by Dallas,
UK Oil & Gas PLC (London AIM: UKOG) is pleased to announce that construction of Pinarova-1’s drilling pad and access road commenced on schedule over the weekend.