Interim Report and Accounts for the Three and Six Months Ended 30 June 2021
Interim Report and Accounts for the Three and Six Months Ended 30 June 2021
60.60 m (54.5 m true width) at 1.98 g/t gold, Near Surface, incl. 5.75 m (5.2 m true width) at 16.88 g/t gold within the Fully Permitted La India Open
6.26g/t gold over 8.1m true width from 38.0m drill depth (LIDC442) All Assay Results Received from Drilling La India Starter Pits
14.9m True Width at 3.94g/t Gold (including 2.6m at 7.76g/t Gold) at Cacao Vein
Condor selects Hanlon Engineering as the Lead Engineer for a Feasibility Study Design for a New Processing Plant Utilizing the Recently Acquired New SAG Mill
Leon Coetzer, Chief Executive Officer, says: With the Windsor PGM Project reaching its full operational status we have reached yet another significant milestone as we continue to grow and diversify