Interim Report and Accounts for the Three and Six Months Ended 30 June 2021
Interim Report and Accounts for the Three and Six Months Ended 30 June 2021
60.60 m (54.5 m true width) at 1.98 g/t gold, Near Surface, incl. 5.75 m (5.2 m true width) at 16.88 g/t gold within the Fully Permitted La India Open
6.26g/t gold over 8.1m true width from 38.0m drill depth (LIDC442) All Assay Results Received from Drilling La India Starter Pits