Interim Report and Accounts for the Three and Six Months Ended 30 June 2021
Interim Report and Accounts for the Three and Six Months Ended 30 June 2021
It has been another busy week in the mining sector, with news flowing from multiple companies.
60.60 m (54.5 m true width) at 1.98 g/t gold, Near Surface, incl. 5.75 m (5.2 m true width) at 16.88 g/t gold within the Fully Permitted La India Open
6.26g/t gold over 8.1m true width from 38.0m drill depth (LIDC442) All Assay Results Received from Drilling La India Starter Pits
I3 Energy (I3E) continues to be a busy company in terms of newsflow, something which is not entirely surprising given the strong backdrop for oilers given the favourable commodity position,
14.9m True Width at 3.94g/t Gold (including 2.6m at 7.76g/t Gold) at Cacao Vein
Serviceman takes on seven days of endurance with no rest for charity
Condor selects Hanlon Engineering as the Lead Engineer for a Feasibility Study Design for a New Processing Plant Utilizing the Recently Acquired New SAG Mill
1,700m Geotechnical Drilling Commenced at Fully Permitted La India Open Pit to a Feasibility Level of Design as Condor moves towards it’s gold production goal
8,500m Infill Drilling Commenced and Update on Mine Schedules for the Fully Permitted La Mestiza Open Pit.
Condor Gold (AIM: CNR; TSX: COG) announces that it has today published its unaudited financial results for the three months ending 31 March 2021 and the Management’s Discussion and Analysis
Drill Intercept 22.05 m (21.6 m true width) at 6.48 g/t gold from 24.75 m drill depth in La India Starter Pits