{"id":110203,"title":"Synergia Energy Ltd (AIM:SYN) Cambay C-77H Workover Update","publisher":"Share Talk","author":"sharetalk","published":"2023-09-25T13:09:54+00:00","modified":"2023-09-25T15:59:24+00:00","canonical_url":"https://www.share-talk.com/synergia-energy-ltd-aimsyn-cambay-c-77h-workover-update-2/","markdown_url":"https://www.share-talk.com/synergia-energy-ltd-aimsyn-cambay-c-77h-workover-update-2.md","json_url":"https://www.share-talk.com/synergia-energy-ltd-aimsyn-cambay-c-77h-workover-update-2.json","category":"Energy","categories":["Energy"],"tags":["Bhandut Field","Cambay","gas","GSPC","Gujarat","India","Indonesia","Joe Salomon","JPDA 06-103","LNG","LPG","OEX","oil","Oilex","Oilex Ltd","ONSHORE GUJARAT","Petroleum","Roland Wessel","Share Talk","SYN","Synergia Energy","TIMOR SEA","WEST KAMPAR"],"featured_image":"https://i0.wp.com/www.share-talk.com/wp-content/uploads/2023/11/Stencil-Google-Chrome-2023-04-19-at-2.47.43-PM.jpeg?fit=1231%2C615&quality=89&ssl=1","format":"news","language":"en-GB","content":"**Synergia Energy Limited** (“Synergia” or the “Company”), is pleased to announce the following update on the Cambay C-77H workover operation.\n\nThe jet pump installation into the C-77H well has been successfully completed and the artificial lift system is operational. The fluids in the wellbore, both condensate and brine, are currently being lifted (brine was used to kill the well prior to the pump installation).\n\nFurther announcements concerning production rates will be made once the well has been cleared of fluids and flow rates have stabilised.\n\nFor and on behalf of Synergia Energy Limited\n\n**Roland Wessel**\n\n**CEO**"}