---
title: "Synergia Energy Ltd (AIM:SYN) Cambay C-77H Artificial Lift Update"
publisher: "Share Talk"
author: "sharetalk"
published: "2023-03-09T07:39:51+00:00"
modified: "2023-03-09T07:39:51+00:00"
date: 2023-03-09
canonical: "https://www.share-talk.com/synergia-energy-ltd-aimsyn-cambay-c-77h-artificial-lift-update/"
category: "Energy"
categories: ["Energy"]
tags: ["Bhandut Field", "Cambay", "gas", "GSPC", "Gujarat", "India", "Indonesia", "Joe Salomon", "JPDA 06-103", "LNG", "LPG", "OEX", "oil", "Oilex", "Oilex Ltd", "ONSHORE GUJARAT", "Petroleum", "Roland Wessel", "Share Talk", "SYN", "Synergia Energy", "TIMOR SEA", "WEST KAMPAR"]
image: "https://i0.wp.com/www.share-talk.com/wp-content/uploads/2023/11/Stencil-Google-Chrome-2023-04-19-at-2.47.43-PM.jpeg?fit=1231%2C615&quality=89&ssl=1"
format: "news"
language: "en-GB"
---

# Synergia Energy Ltd (AIM:SYN) Cambay C-77H Artificial Lift Update

**Published:** March 9, 2023
**Author:** sharetalk
**Categories:** Energy
**Tags:** Bhandut Field, Cambay, gas, GSPC, Gujarat, India, Indonesia, Joe Salomon, JPDA 06-103, LNG, LPG, OEX, oil, Oilex, Oilex Ltd, ONSHORE GUJARAT, Petroleum, Roland Wessel, Share Talk, SYN, Synergia Energy, TIMOR SEA, WEST KAMPAR
**Featured image:** ![](https://i0.wp.com/www.share-talk.com/wp-content/uploads/2023/11/Stencil-Google-Chrome-2023-04-19-at-2.47.43-PM.jpeg?fit=1231%2C615&quality=89&ssl=1)

---

**Synergia Energy Ltd** (the “Company” or “Synergia”) is pleased to provide the following update concerning the Cambay C-77H well.

Extensive evaluation of the artificial lift options for the C-77H well and future Cambay new wells has resulted in the Company electing to adopt a jet pump solution for the C-77H well. This is due to a combination of technical, cost and availability drivers.

The jet pump solution has the advantage of being immune to elastomer degradation caused by the high aromatic content of the Cambay Eocene condensate, as jet pumps contain no elastomers.

The jet pump solution is also more cost-effective, particularly for a full-field development where jet pumps in multiple wells can be driven by a single common surface pump.

In addition, jet pump availability is significantly better than PCP pumps at present, which have delivery times of up to 8 months. The Company aims to have the jet pump solution for the C-77H well operational in the next 90 days.

For and on behalf of Synergia Energy Limited

**Roland Wessel**

CEO

For further information, please contact:

**Investor Enquiries**

Synergia Energy Ltd

Briana Stayt

Investor Relations

Email:[bstayt@synergiaenergy.com](mailto:bstayt@synergiaenergy.com)

Tel: +61 8 9485 3200

Australia

---

**Original URL:** https://www.share-talk.com/synergia-energy-ltd-aimsyn-cambay-c-77h-artificial-lift-update/
*Created by [WP Markdown Endpoint](https://wpmarkdownendpoint.com/)*
