{"id":129347,"title":"Synergia Energy (AIM: SYN) Reports Production Progress and Drilling Milestones at Cambay PSC","publisher":"Share Talk","author":"sharetalk","published":"2025-11-17T09:39:40+00:00","modified":"2025-11-17T09:39:40+00:00","canonical_url":"https://www.share-talk.com/synergia-energy-aim-syn-reports-production-progress-and-drilling-milestones-at-cambay-psc/","markdown_url":"https://www.share-talk.com/synergia-energy-aim-syn-reports-production-progress-and-drilling-milestones-at-cambay-psc.md","json_url":"https://www.share-talk.com/synergia-energy-aim-syn-reports-production-progress-and-drilling-milestones-at-cambay-psc.json","category":"Energy","categories":["Energy"],"tags":["Bhandut Field","Cambay","gas","GSPC","Gujarat","India","Indonesia","Joe Salomon","JPDA 06-103","LNG","LPG","OEX","oil","Oilex","Oilex Ltd","ONSHORE GUJARAT","Petroleum","Roland Wessel","Share Talk","SYN","Synergia Energy","TIMOR SEA","WEST KAMPAR"],"featured_image":"https://i0.wp.com/www.share-talk.com/wp-content/uploads/2025/04/SYN-22ND-JULY-750x406-1.webp?fit=750%2C406&quality=80&ssl=1","format":"news","language":"en-GB","content":"[Synergia Energy Limited](https://www.investegate.co.uk/announcement/rns/synergia-energy-ltd-npv--syn/cambay-psc-update-/9237852) has released an operational update on its **Cambay PSC** activities, highlighting steady progress across both production wells and the current drilling programme.\n\nAt the **C-64 well**, recent workover operations have lifted output to an **average of 30 bopd**. The **C-72 well** remains in the brine-clearance phase, with production updates expected once the operation is complete. Meanwhile, the **C-74 workover** has concluded, with a **sucker rod pump installed** and preparations underway for the well to enter production.\n\nThe **Aakash rig** has now been mobilised to the **C-19z well**, where a clean-up operation is being initiated.\n\nIn drilling activity, the **C-78 well** has reached a **total depth of 1,827 metres**, successfully intersecting the targeted **OSII formation at 1,745 metres**. Logging operations are currently in progress.\n\nSynergia said further updates will be provided as the programme advances across its multi-well campaign.\n\nRoland Wessel\n\nCEO\n\nFor further information, please contact:\n\n|   |\n| --- |\n| Investor Enquires Synergia Energy Ltd Briana Stayt Investor Relations Email: [bstayt@synergiaenergy.com](mailto:bstayt@synergiaenergy.com) Tel: +61 8 9485 3200 Australia |"}