---
title: "Synergia Energy (AIM: SYN) Advances Cambay Field Work Program in India"
publisher: "Share Talk"
author: "sharetalk"
published: "2025-11-10T14:28:40+00:00"
modified: "2025-11-10T17:26:00+00:00"
date: 2025-11-10
canonical: "https://www.share-talk.com/synergia-energy-aim-syn-advances-cambay-field-work-program-in-india/"
category: "Energy"
categories: ["Energy"]
tags: ["Bhandut Field", "Cambay", "gas", "GSPC", "Gujarat", "India", "Indonesia", "Joe Salomon", "JPDA 06-103", "LNG", "LPG", "OEX", "oil", "Oilex", "Oilex Ltd", "ONSHORE GUJARAT", "Petroleum", "Roland Wessel", "Share Talk", "SYN", "Synergia Energy", "TIMOR SEA", "WEST KAMPAR"]
image: "https://i0.wp.com/www.share-talk.com/wp-content/uploads/2024/07/SYN-22ND-JULY.webp?fit=1200%2C800&quality=80&ssl=1"
format: "news"
language: "en-GB"
---

# Synergia Energy (AIM: SYN) Advances Cambay Field Work Program in India

**Published:** November 10, 2025
**Author:** sharetalk
**Categories:** Energy
**Tags:** Bhandut Field, Cambay, gas, GSPC, Gujarat, India, Indonesia, Joe Salomon, JPDA 06-103, LNG, LPG, OEX, oil, Oilex, Oilex Ltd, ONSHORE GUJARAT, Petroleum, Roland Wessel, Share Talk, SYN, Synergia Energy, TIMOR SEA, WEST KAMPAR
**Featured image:** ![](https://i0.wp.com/www.share-talk.com/wp-content/uploads/2024/07/SYN-22ND-JULY.webp?fit=1200%2C800&quality=80&ssl=1)

---

**Synergia Energy Limited** has reported steady progress in its operations at the Cambay Production Sharing Contract (PSC) in India.

The company confirmed that **workover operations on the C-64 well have been completed**, with the well now **producing an average of 23 barrels of oil per day (bopd)**.

Similarly, the **C-72 well workover has also been finished**, and a **sucker rod pump (SRP)** has been installed. Synergia said **stable production figures will be released soon**, after which the rig will move to the **C-74 well**—the final step in the company’s current three-well campaign.

Meanwhile, **drilling of the C-78 well has reached a depth of 603 meters** in a 12¼-inch hole section, where casing has been successfully set. Drilling has now **resumed in the 8.5-inch section**, marking continued momentum in the company’s development program.

For and on behalf of Synergia Energy Limited

Roland Wessel

CEO

For further information, please contact:

|   |
| --- |
| Investor Enquires Synergia Energy Ltd Briana Stayt Investor Relations Email: [bstayt@synergiaenergy.com](mailto:bstayt@synergiaenergy.com) Tel: +61 8 9485 3200 Australia |

---

**Original URL:** https://www.share-talk.com/synergia-energy-aim-syn-advances-cambay-field-work-program-in-india/
*Created by [WP Markdown Endpoint](https://wpmarkdownendpoint.com/)*
