---
title: "Sound Energy PLC (AIM:SOU) Tendrara: TE-7 Pressure Build Up"
publisher: "Share Talk"
author: "sharetalk"
published: "2017-07-19T06:38:13+00:00"
modified: "2017-11-05T16:48:50+00:00"
date: 2017-07-19
canonical: "https://www.share-talk.com/sound-energy-plc-aimsou-tendrara-te-7-pressure-build-up/"
category: "Energy"
categories: ["Energy"]
tags: ["Sound Energy PL"]
image: "https://i0.wp.com/www.share-talk.com/wp-content/uploads/2023/11/Stencil-Google-Chrome-2023-04-19-at-2.47.43-PM.jpeg?fit=1231%2C615&quality=89&ssl=1"
format: "news"
language: "en-GB"
---

# Sound Energy PLC (AIM:SOU) Tendrara: TE-7 Pressure Build Up

**Published:** July 19, 2017
**Author:** sharetalk
**Categories:** Energy
**Tags:** Sound Energy PL
**Featured image:** ![](https://i0.wp.com/www.share-talk.com/wp-content/uploads/2023/11/Stencil-Google-Chrome-2023-04-19-at-2.47.43-PM.jpeg?fit=1231%2C615&quality=89&ssl=1)

---

Sound Energy, the African and European focused upstream gas company, is pleased to provide an update on the TE-7 extended well test, including an initial measurement of the reservoir pressure build-up response.

![](https://www.share-talk.com/wp-content/uploads/2017/07/TEN-300x193.jpg)

In January 2017, the Company finalised the draw down phase of its extended well test at TE-7, the Company’s second well at Tendrara, onshore Eastern Morocco.  As announced on 19 January 2017, the Company flowed close to 1.0 Bcf over a period of 56 days during this phase.  The Company has subsequently retrieved the downhole pressure gauges from TE-7 to analyse the initial reservoir pressure response.

 The bottom hole pressure was recorded at 393.8 bar (against a final drawdown flowing reservoir pressure of 140 Bar in January 2017, immediately following the test, and an original reservoir pressure of 422.6 Bar). The Company, therefore, concludes that TE-7 has demonstrated a very strong pressure recovery to date.  As expected with low permeability reservoirs, the pressure build up is still ongoing and pressure stabilisation is estimated to require a further six to eight months.  

Reservoir simulations suggest that, once the reservoir has reached full pressure stabilisation, the estimated connected gas volumes in place (gross, unrisked) for production from TE-7 are 40 Bscf. This is consistent with the Company’s preliminary volume estimates announced on 23 May 2017 and enables the Company to confirm a field development concept with regular spacing of sub horizontal stimulated wells, similar in design to TE-7.

![](https://www.share-talk.com/wp-content/uploads/2017/07/TEN-1-300x165.jpg)

[idz_button color=”default” size=”large” label=”Sound Energy PLC Investor Presentation” icon=”” link=”http://www.soundenergyplc.com/media/1501/investor-presentation-q3-2017.pdf” target=”_blank” type=”square_shape” class=””]

This announcement is inside information for the purposes of Article 7 of Regulation 596/2014.

[www.soundenergyplc.com](http://www.soundenergyplc.com/)

 

---

**Original URL:** https://www.share-talk.com/sound-energy-plc-aimsou-tendrara-te-7-pressure-build-up/
*Created by [WP Markdown Endpoint](https://wpmarkdownendpoint.com/)*
