---
title: "Serinus Energy PLC (AIM:SENX) Interim Results for the six months ended 30 June 2022"
publisher: "Share Talk"
author: "sharetalk"
published: "2022-08-15T06:43:58+00:00"
modified: "2022-08-15T06:46:12+00:00"
date: 2022-08-15
canonical: "https://www.share-talk.com/serinus-energy-plc-aimsenx-interim-results-for-the-six-months-ended-30-june-2022/"
category: "Energy"
categories: ["Energy"]
tags: ["Andrew Fairclough", "Basin", "Calvin Brackman", "Canar-1", "Carei", "gas", "gross pay", "HYDROCARBON", "Jeffrey Auld", "Moftinu", "oil", "Petroleum", "Plant", "production", "Romania", "Sancrai - 1", "SENX", "Serinus Energy", "Share Talk", "Stuart Morrison", "Tunisia", "upstream", "Well", "zones"]
image: "https://i0.wp.com/www.share-talk.com/wp-content/uploads/2023/11/Stencil-Google-Chrome-2023-04-19-at-2.47.43-PM.jpeg?fit=1231%2C615&quality=89&ssl=1"
format: "news"
language: "en-GB"
---

# Serinus Energy PLC (AIM:SENX) Interim Results for the six months ended 30 June 2022

**Published:** August 15, 2022
**Author:** sharetalk
**Categories:** Energy
**Tags:** Andrew Fairclough, Basin, Calvin Brackman, Canar-1, Carei, gas, gross pay, HYDROCARBON, Jeffrey Auld, Moftinu, oil, Petroleum, Plant, production, Romania, Sancrai - 1, SENX, Serinus Energy, Share Talk, Stuart Morrison, Tunisia, upstream, Well, zones
**Featured image:** ![](https://i0.wp.com/www.share-talk.com/wp-content/uploads/2023/11/Stencil-Google-Chrome-2023-04-19-at-2.47.43-PM.jpeg?fit=1231%2C615&quality=89&ssl=1)

---

Jersey, Channel Islands, 15 August 2022 – **Serinus Energy plc** (“Serinus” or the “Company”) (AIM:SENX, WSE:SEN), is pleased to announce its interim results for the six months ended 30 June 2022.

**Financial**

· Revenue for the six months ended 30 June 2022 was $29.3 million (30 June 2021 – $15.9 million)

· Funds from operations for the six months ended 30 June 2022 were $ 8.2 million (30 June 2021 – $ 5.3 million)

· EBITDA for the six months ended 30 June 2022 was $8.1 million ( 30 June 2021 – $5.5 million)

· Gross profit for the six months ended 30 June 2022 was $8.0 million (30 June 2021 – $2.1 million)

· The Company realised a net price of $154.83/boe for the six months ended 30 June 2022 comprising:

o Realised oil price – $101.63/bbl

o Realised natural gas price – $33.80/Mcf

· The Group’s operating netback remained strong for the six months ended 30 June 2022 and was $113.38/boe ( 30 June 2021 – $26.72/boe), comprising:

o Romania operating netback – $171.01/boe ( 30 June 2021 – $28.73/boe)

o Tunisia operating netback – $63.49/boe ( 30 June 2021 – $21.85/boe)

· Capital expenditures of $4.2 million ( 30 June 2021 – $5.9 million), comprising:

o Romania – $3.5 million

o Tunisia – $0.7 million

· Working capital improved to $2.8 million (31 December 2021 – $0.6 million)

· Cash balance as at 30 June 2022 was $7.2 million (31 December 2022 – $8.4 million)

**Operational**

· Canar-1 exploration well commenced drilling on 4 August 2022

· Canar-1 will be drilled to 1,600 metres, targeting three prospective hydrocarbon zones and with success will be connected to the Moftinu gas plant, utilising current plant capacity

· Immediately upon completion of the drilling of Canar-1, the rig will be moved to the Moftinu Nord-1 location and will commence drilling of the Moftinu Nord-1 exploration well

· Moftinu Nord-1 will be drilled to a depth of 1,000 metres and will target a field similar to the Moftinu gas field. Moftinu Nord-1 is approximately five kilometres to the north of the Moftinu gas development project

· Management estimates 181 million barrels of mean unrisked resource are present within the Satu Mare concession area

· The Company has initiated a geological and geophysical review of the Satu Mare concession to high rank the 181 million barrels of oil equivalent prospects

· In Tunisia, production has remained stable in the first half of 2022. All material and consumables for the artificial lift programme at the Sabria W-1 well have been received in-field and the Company is awaiting mobilisation of the rig

· Workover at the CS-9 well at Chouech Es Saida is ongoing

· Production for the period averaged 1,006 boe/d, comprising:

o Romania – 485 boe/d

o Tunisia – 521 boe/d

· In April 2022, the Company performed a lifting of 42,000 bbls of Tunisian crude oil at a price of $104.79/bbl

· The Company has scheduled the next lifting and expects to perform this lifting in August 2022

**About Serinus**

Serinus is an international upstream oil and gas exploration and production company that owns and operates projects in Tunisia and Romania.

For further information, please refer to the Serinus website ([www.serinusenergy.com](http://www.serinusenergy.com)) or contact the following:

**Serinus Energy plc**

Jeffrey Auld, Chief Executive Officer

Andrew Fairclough, Chief Financial Officer

Calvin Brackman, Vice President, External Relations & Strategy

+4 4 204 541 7859

---

**Original URL:** https://www.share-talk.com/serinus-energy-plc-aimsenx-interim-results-for-the-six-months-ended-30-june-2022/
*Created by [WP Markdown Endpoint](https://wpmarkdownendpoint.com/)*
