{"id":129936,"title":"Pulsar Helium Inc. (AIM: PLSR, TSXV: PLSR, OTCQB: PSRHF) Commences Drilling of Jetstream #5","publisher":"Share Talk","author":"sharetalk","published":"2025-12-03T07:23:42+00:00","modified":"2025-12-03T07:23:42+00:00","canonical_url":"https://www.share-talk.com/pulsar-helium-inc-aim-plsr-tsxv-plsr-otcqb-psrhf-commences-drilling-of-jetstream-5/","markdown_url":"https://www.share-talk.com/pulsar-helium-inc-aim-plsr-tsxv-plsr-otcqb-psrhf-commences-drilling-of-jetstream-5.md","json_url":"https://www.share-talk.com/pulsar-helium-inc-aim-plsr-tsxv-plsr-otcqb-psrhf-commences-drilling-of-jetstream-5.json","category":"Energy","categories":["Energy"],"tags":["AIM Market","canada","Helium","London Stock Exchange","Med Tech","Medical","OAK Securities","OTCQB Venture Market","Pulsar Helium","Thomas Abraham-James","TSX Venture Exchange","United States"],"featured_image":"https://i0.wp.com/www.share-talk.com/wp-content/uploads/2025/12/G7Ofb0TXgAAwQpB.webp?fit=1000%2C667&quality=80&ssl=1","format":"news","language":"en-GB","content":"[Pulsar Helium Inc. (AIM: PLSR, TSXV: PLSR, OTCQB: PSRHF)](https://www.investegate.co.uk/announcement/rns/pulsar-helium-inc--plsr/pulsar-helium-commences-drilling-of-jetstream-5/9271810), a primary helium project development company, is pleased to announce that the drill rig and all ancillary equipment have been relocated to the Jetstream #5 drill pad, located 1.8 miles (3 kilometers) northeast of Jetstream #1, at the Company’s flagship Topaz project in Minnesota, USA.\n\nJetstream #5 has a planned target depth of 5,000 feet (1,524 meters). The Company is pleased to confirm that rigging-up operations commenced on Thursday, November 27, 2025, and that the Jetstream #5 well was spudded on Friday, November 28, 2025.\n\n**Topaz drilling campaign highlights:**\n\n·   ** Jetstream #1 (47.63468333 N / -91.70114444 W).**\n\n**Helium-3 discovery: **Concentrations of up to 14.5 parts per billion (ppb) were recorded in produced gas.\n\n**Completion****:** January 13, 2025\n\n**TD****:** 5,100 feet / 1,555 meters\n\n**Gas Concentrations****:** 4He 8.1% | 3He 14.5 PPB | CO2 72.9%\n\n**Natural Flow****:** Yes, 200,000 cubic feet per day average over 7-day test with 60 psi drawdown\n\n**Well pressure:** Well-head pressure ~122 PSI\n\n**Formation Water****:** None present\n\n·  ** **** ****Jetstream #2 (47.63330694 N / -91.70267305 W)**.\n\nHigh helium and pressure: High helium concentrations encountered of up to 6.5% in initial gas samples, alongside a strong initial shut-in pressure ~151 psi (10.4 bar), notably higher than Jetstream #1 indicating a highly charged reservoir with excellent pressure support.\n\n**Completion****:** February 3, 2025\n\n**TD****:** 5,638 feet / 1,718 meters\n\n**Gas Concentrations****:** 4He 5.6% | CO2 79.8%\n\n**Natural Flow****:** Yes, 21,000 cubic feet per day average over 1-day test with 60 psi drawdown\n\n**Well pressure: **Well-head pressure ~151 PSI\n\n**Formation Water****:** None present\n\n·   ** Jetstream #3 (47.64228213 N/ -91.70159457 W).**\n\nStrong reservoir pressure: Multiple pressurized gas zones throughout the drilling campaign with a calculated bottom-hole pressure of approximately 960 psi. This strong pressure reading indicates a robust, naturally pressurized, highly charged reservoir at the well location.\n\n**Completion****:** November 7, 2025\n\n**TD****:** 3,507 feet / 1,069 metres\n\n**Gas Concentrations****:** Unknown. Awaiting testing.\n\n**Natural Flow****:** Yes, value to be determined.\n\nWell pressure (not under compression): Bottom-hole pressure ~960 psi\n\n**Formation Water****:** None present\n\n·   ** Jetstream #4 (47.63693443 N/ -91.7008531 W).**\n\nTD reached and helium zone penetrated: The Company’s latest appraisal well, was successfully drilled to a total depth of 3,000 feet (915 meters) on November 25, 2025, penetrating the entire interpreted helium-bearing interval. During drilling, pressurized gas with an estimated bottom-hole pressure of approximately 887 psi was encountered at a depth of 1,897 feet (578 meters).\n\n**Completion****:** November 26, 2025\n\n**TD****:** 3,000 feet / 915 meters\n\nSustained Gas Concentrations: Unknown. Awaiting testing.\n\n**Natural Flow****:** Yes, value to be determined.\n\n**Well pressure****:** bottom-hole pressure ~887 psi\n\n**Formation Water****:** None present\n\n**About the Topaz Project**\n\nThe Topaz project is located in northern Minnesota, USA, where Pulsar is the first mover and holds exclusive leases. Drilling at the Jetstream #1 appraisal well reached a TD of 5,100 feet (1,555 meters) in January 2025, successfully penetrating the entire interpreted helium-bearing reservoir and beyond. Drilling of the Jetstream #2 appraisal well was completed on February 1, 2025, reaching a TD of 5,638 feet (1,718 meters). Jetstream #3 reached TD on November 7, 2025, and during drilling the calculated bottom-hole pressure was ~960 psi, with down-hole testing and gas sampling to soon occur now that Jetstream #4 has been completed. In August 2025, the Jetstream #1 well was successfully flow-tested using a wellhead compressor, delivering a peak gas flow rate of approximately 1.3 million cubic feet per day with a sustained flow average of 8.1% helium (as helium-4). Recent laboratory analyses have also confirmed the presence of helium-3 in measurable concentrations The ongoing multi-well drilling campaign will build on these results to expand Pulsar’s understanding of the reservoir.\n\nOn behalf Pulsar Helium Inc.\n\n“Thomas Abraham-James”\n\nPresident, CEO and Director\n\nFurther Information:\n\nPulsar Helium Inc.\n\n[connect@pulsarhelium.com](mailto:connect@pulsarhelium.com)  \n\n+ 1 (218) 203-5301 (USA/Canada)\n\n+44 (0) 2033 55 9889 (United Kingdom)\n\n[https://pulsarhelium.com](https://pulsarhelium.com/)\n\n[https://ca.linkedin.com/company/pulsar-helium-inc](https://ca.linkedin.com/company/pulsar-helium-inc)."}