{"id":47646,"title":"Poole Bay oil rig misses intended target","publisher":"Share Talk","author":"sharetalk","published":"2019-03-01T12:01:34+00:00","modified":"2019-03-01T12:01:34+00:00","canonical_url":"https://www.share-talk.com/poole-bay-oil-rig-misses-intended-target/","markdown_url":"https://www.share-talk.com/poole-bay-oil-rig-misses-intended-target.md","json_url":"https://www.share-talk.com/poole-bay-oil-rig-misses-intended-target.json","category":"Energy","categories":["Energy"],"tags":["Bournemouth","Corallian","Dorset","Poole Bay"],"featured_image":"https://i0.wp.com/www.share-talk.com/wp-content/uploads/2023/11/Stencil-Google-Chrome-2023-04-19-at-2.47.43-PM.jpeg?fit=1231%2C615&quality=89&ssl=1","format":"news","language":"en-GB","content":"An oil rig carrying out test drilling off the Dorset coast “unexpectedly” missed its target but has hit another known area of oil and gas reserves.\n\nEnergy firm Corallian has already been granted a month-long extension until the end of March to continue drilling from the temporary rig in Poole Bay.\n\nThe firm has also been granted permits to drill laterally to its original target, known as the Colter Prospect.\n\nEnvironmentalists fear further drilling will increase the risk to wildlife.\n\nCorallian said its vertical well, off Bournemouth, had reached oil and gas in an area referred to as Colter South, after drilling “unexpectedly remained on the southern side of the Colter Prospect”.\n\nCorallian estimated Colter South contained about 15 million barrels of recoverable oil but it said further work would now be needed to “refine this assessment”.\n\nIt said it was making preparations to drill a side track to evaluate the neighbouring Colter Prospect, which would take about two weeks.\n\n‘Reckless plan’\n\nMarine conservation charity Save Our Shores said the additional drilling chemicals released into the sea as a result could pose a threat to wildlife.\n\nCharity spokeswoman Hannah Sharland said: “This reckless plan will put many endangered and protected species of wildlife, such as the two types of seahorse found in the area and many important species of fish, at further unnecessary risk.”\n\nBournemouth Borough Council said it was “disappointed” it was not consulted on the new drilling permits.\n\nLeader John Beesley said: “We would want to see this operation finalised at the earliest possible opportunity so that risks associated with the operation to our marine environment can be eliminated.”\n\n![](https://www.share-talk.com/wp-content/uploads/2019/03/Image-2019-03-01-at-11.57.37-AM-300x198.png)\n\nCorallian previously claimed mitigation measures would ensure no “significant effects to the marine ecosystem”.\n\nA spokesman said: “We have all the regulatory consents in place to do the additional drilling work at the same location and all the mitigation measures remain in place.”\n\nIf oil can be economically produced, Corallian proposes extracting it by drilling horizontally from the shore. However, such a scheme would require a separate licence.\n\nSource Link [https://www.bbc.co.uk/news/uk-england-dorset-47380239](https://www.bbc.co.uk/news/uk-england-dorset-47380239)\n\n "}