{"id":127886,"title":"Pantheon Resources (AIM: PANR) Completes Fracture Stimulation at Dubhe-1 Well","publisher":"Share Talk","author":"sharetalk","published":"2025-10-08T13:57:56+00:00","modified":"2025-10-08T13:57:56+00:00","canonical_url":"https://www.share-talk.com/pantheon-resources-aim-panr-completes-fracture-stimulation-at-dubhe-1-well/","markdown_url":"https://www.share-talk.com/pantheon-resources-aim-panr-completes-fracture-stimulation-at-dubhe-1-well.md","json_url":"https://www.share-talk.com/pantheon-resources-aim-panr-completes-fracture-stimulation-at-dubhe-1-well.json","category":"Energy","categories":["Energy"],"tags":["Alaska","barrels","Bob Rosenthal","Dalton Highway","Exploration","gas","Jay Cheatham","Jay Cheatham (CEO)","Justin Hondris (Finance Director)","Kuparuk horizon","Michael Duncan (COO)","oil","oil-bearing","PANR","Pantheon Resources","Share Talk","Talitha","Trans-Alaska Pipeline"],"featured_image":"https://i0.wp.com/www.share-talk.com/wp-content/uploads/2025/10/PANR-OCT.webp?fit=1200%2C800&quality=80&ssl=1","format":"news","language":"en-GB","content":"**Dubhe-1 Operational Update – Successful Completion of Fracture Stimulation Operations**\n\nPantheon Resources PLC has announced the successful completion of **hydraulic fracture stimulation** operations at its **Dubhe-1 well**.\n\nThe programme involved **25 individual stages**, each approximately **200 feet** in length, and was completed over **eight days**. The **Dubhe-1 lateral** had previously been drilled to a **total measured depth of 15,800 feet**, with around **5,200 feet** of the wellbore situated within the **SMD-B target reservoir**.\n\nThe company will now move to **clean-up and production testing**, which will include **drilling out plugs**, **installing 2-7/8 inch production tubing**, and **connecting the well to a temporary testing system**.\n\n**Key Points**\n\n·      25 hydraulic fracture stimulation stages successfully completed in 8 days\n\n·      Operations are now underway to prepare well for clean-up and production testing\n\n**Erich Krumanocker, Chief Development Officer, said:** “We are extremely pleased with the success of the operations so far. The team did an excellent job executing this large and intricate operation safely and efficiently. The stimulation was performed as planned, increasing our confidence in achieving the objectives of the forthcoming flow testing programme.”\n\nFurther information, please contact:\n\n|   |   |\n| --- | --- |\n| AGDC | +1 907 717 4978 |\n| Frank Richards, President |  |\n| Tim Fitzpatrick, Communications |  |\n|  |  |\n| Pantheon Resources plc |                 +44 20 7484 5361 |\n| David Hobbs, Executive Chairman |  |\n| Jay Cheatham, Chief Executive Officer |  |\n| Justin Hondris, Director, Finance and Corporate Development |  |"}