{"id":99257,"title":"Oilex Ltd (ASX:AIM:OEX) Cambay C-77H Re-frac Operations Update No2","publisher":"Share Talk","author":"sharetalk","published":"2022-07-18T08:48:53+00:00","modified":"2022-07-18T08:48:53+00:00","canonical_url":"https://www.share-talk.com/oilex-ltd-asxaimoex-cambay-c-77h-re-frac-operations-update-no2/","markdown_url":"https://www.share-talk.com/oilex-ltd-asxaimoex-cambay-c-77h-re-frac-operations-update-no2.md","json_url":"https://www.share-talk.com/oilex-ltd-asxaimoex-cambay-c-77h-re-frac-operations-update-no2.json","category":"Energy","categories":["Energy"],"tags":["Bhandut Field","Cambay","gas","GSPC","Gujarat","India","Indonesia","Joe Salomon","JPDA 06-103","LNG","LPG","OEX","oil","Oilex","Oilex Ltd","ONSHORE GUJARAT","Petroleum","Roland Wessel","TIMOR SEA","WEST KAMPAR"],"featured_image":"https://i0.wp.com/www.share-talk.com/wp-content/uploads/2023/11/Stencil-Google-Chrome-2023-04-19-at-2.47.43-PM.jpeg?fit=1231%2C615&quality=89&ssl=1","format":"news","language":"en-GB","content":"**Oilex Limited** (Oilex or the Company) is pleased to announce the following update with respect to its operations in India.\n\n**C-77H Re-frac Operations Update**\n\nAll of the equipment necessary for the re-frac operation has arrived onsite with the exception of the coiled tubing unit (CTU) which has been delayed by monsoon season-related rain. The CTU is expected to arrive onsite tomorrow after which the initial stage of the re-fraccing operation, perforating the zones to be hydraulically fractured, will commence.\n\nThe actual fraccing operation is anticipated to last 7 days and will be followed by flow-back and testing. We currently expect to be able to announce the results of the re-frac operation in August 2022.\n\n**For and on behalf of Oilex Ltd**\n\n**Roland Wessel**\n\n**Managing Director**"}