Mosman Oil & Gas (AIM:MSMN) Cinnabar Near Term Production Opportunities

Mosman Oil and Gas Limited (AIM: MSMN) the oil exploration, development, and production company, announces that as a result of the work programme to bring the new development well at Cinnabar onto production, other near term production opportunities have now been identified.

Mosman has successfully drilled a development well at the Cinnabar project (Cinnabar-1), and flow rates will be announced when received. Mosman will use the results to update an independent Reserves Report on the Cinnabar property, which was previously produced for a third party.

Whist drilling the Cinnabar-1 well, attention was turned to the two older wells on the Cinnabar lease, which is Held by Production. These wells, Arco Fee G-1 (‘G1’) and Arco Fee G-2 (‘G2’) were originally drilled in the 1980’s and both produced significant oil and some gas. Both wells are drilled to approximately 10,000 feet and completed for production.

Mosman has been working on near term opportunities to increase production at these two production wells and identified the following lower cost opportunities:

· Install artificial lift (eg. gas lift) to increase production from the existing G-1 well;

· Review the potential to recomplete G-1 well in deeper Wilcox zones;

· Workover the existing G-2 well with the intention of producing from the 1st Wilcox sand that was the main production sand in G-1 but has not been produced at G-2; and

· Review the potential to recomplete G-2 in deeper Wilcox zones.

The detailed desktop work required before field work has now commenced.

Mosman owns a c.75% working interest in the Cinnabar well and the Cinnabar lease. Mosman Operating LLC, a 100% owned subsidiary of Mosman, is the Operator of the lease .

Market Abuse Regulation (MAR) Disclosure

The information contained within this announcement is deemed by the Company to constitute inside information as stipulated under the Market Abuse Regulations (EU) No. 596/2014 (‘MAR’) which has been incorporated into UK law by the European Union (Withdrawal) Act 2018. Upon the publication of this announcement via Regulatory Information Service (‘RIS’), this information is now considered to be in the public domain.

Enquiries:

Mosman Oil & Gas Limited

John W Barr, Executive Chairman, [email protected]

Andy Carroll, Technical Director, [email protected]


Linking Shareholders and Executives :Share Talk

If anyone reads this article found it useful, helpful? Then please subscribe www.share-talk.com or follow SHARE TALK on our Twitter page for future updates. Terms of Website Use All information is provided on an as-is basis. Where we allow Bloggers to publish articles on our platform please note these are not our opinions or views and we have no affiliation with the companies mentioned