{"id":143361,"title":"Mendell Helium Reports Strong Production Potential Across Kansas Wells","publisher":"Share Talk","author":"sharetalk","published":"2026-11-24T07:21:46+00:00","modified":"2026-11-24T07:21:46+00:00","canonical_url":"https://www.share-talk.com/mendell-helium-reports-strong-production-potential-across-kansas-wells/","markdown_url":"https://www.share-talk.com/mendell-helium-reports-strong-production-potential-across-kansas-wells.md","json_url":"https://www.share-talk.com/mendell-helium-reports-strong-production-potential-across-kansas-wells.json","category":"Energy","categories":["Energy"],"tags":["Carter 2","Dodge City","Exxon","Garden City","Haskell County","Helium","Hugoton gas field","Kansas","M3 Helium","MDH","Mendell Helium","Mendell Helium plc","methane","Mike Whitlow","natural gas liquids","Nick Tulloch","nitrogen","Paul Mandel","Paul Mendell","Scout Energy Partners","south-west Kansas","USA","VOY","Voyager Life","western Kansas","Wyatt Earp"],"featured_image":"https://i0.wp.com/www.share-talk.com/wp-content/uploads/2026/11/39d36c6f-bbf1-48d8-9b28-354e374ed404.png?fit=1727%2C911&quality=80&ssl=1","format":"news","language":"en-GB","content":"[Mendell Helium (LON: MDH)](https://www.investegate.co.uk/announcement/rns/mendell-helium-plc--mdh/operations-update/9889885) has reported encouraging operational progress across its helium production assets in Kansas, with all three wells demonstrating gas production potential as the company advances plans to expand its Fort Dodge operations.\n\nThe US-focused helium exploration and production company confirmed that **Rost 1-26 continues to produce gas at rates of up to 100 thousand cubic feet per day (Mcf/day)**, despite operational interruptions associated with development of the on-site purification facility and improvements to its water disposal infrastructure.\n\nThe company’s flagship Rost 1 well previously achieved stable production of approximately 250 Mcf/day following the removal of around 1,800 barrels of water per day. However, production during 2026 has been affected by temporary shutdowns while work continued on the purification facility and the Brobee saltwater disposal well.\n\nMendell explained that when pumping is interrupted, water accumulates in the well, requiring additional dewatering before higher production rates can resume.\n\n**Rost 1 has consistently recorded helium concentrations of approximately 5.1% at the wellhead**, with the company estimating a net delivered helium equivalent of around 4.5% after allowing for purification losses.\n\nThe company believes more consistent production rates could be achieved once operational interruptions are reduced. Its development budget assumes approximately 20% annual downtime under normal operating conditions.\n\nCurrent maintenance includes chemical treatment to control calcium scale and acid treatment of the well perforations to maintain gas and water flow.\n\nMeanwhile, **Rost 2-26 has recorded helium concentrations of 11.5% at the wellhead**, more than double the concentration measured at Rost 1, despite being located only 330 feet away.\n\nDewatering operations began in September 2026 and are continuing, with the well currently producing approximately 1,000 barrels of water per day.\n\nAlthough free gas volumes remain low, Mendell said performance was consistent with expectations for this stage of development.\n\nTwo recent well-treatment procedures, costing approximately **$6,000 in total**, successfully removed potential obstructions and produced encouraging gas spikes.\n\nThe company said the response demonstrated permeability within the target production zone and strengthened confidence in Rost 2’s future production potential.\n\nMendell is also considering a small acid-fracturing operation if further evaluation indicates that additional stimulation would be beneficial.\n\n**Schneweis Ventures 13A, operated through a joint venture with Ritchie Exploration, is currently delivering stable gas production of approximately 100 Mcf/day**, despite operating under restricted flow conditions.\n\nThe well previously achieved production exceeding 700 Mcf/day while flowing under its own pressure, although these higher rates proved inconsistent.\n\nFollowing installation and commissioning of an on-site pump, Schneweis is now dewatering at approximately 80 barrels per day while maintaining more predictable gas output.\n\nMendell believes higher sustained production rates may be achievable based on reservoir pressure and previous production performance.\n\nImportantly, **the receiving purification plant has confirmed capacity to accommodate approximately 500 Mcf/day from Schneweis**, providing scope for a substantial increase in future output.\n\nSince returning to production, Schneweis has delivered **6,800 Mcf of total gas, including more than 2,000 Mcf during November 2026 up to 19 November**.\n\nUnlike the Rost wells, Schneweis is connected directly to a pipeline operated by Ritchie Exploration, eliminating the need for on-site purification.\n\nThe arrangement also allows Mendell to generate revenue from hydrocarbons alongside helium, despite the well’s lower helium concentration of 1.43%.\n\nThe company views the successful recompletion of Schneweis as evidence that previously inactive oil and gas wells in the Fort Dodge region could offer commercially attractive opportunities for future development.\n\nWater management remains a central component of Mendell’s operating strategy, with the **Brobee saltwater disposal well continuing to perform ahead of expectations**.\n\nBrobee is permitted to handle up to **10,000 barrels of water per day**, with the two Rost wells currently accounting for less than 20% of its available capacity.\n\nThe disposal facility operates under vacuum conditions, helping reduce electricity consumption and pumping maintenance costs.\n\nMendell intends to connect additional production wells to Brobee where practical, potentially reducing capital expenditure and avoiding the time and expense associated with developing separate disposal infrastructure.\n\nLooking ahead, **Mendell confirmed that it has funding in place to drill four new wells in the Fort Dodge region**, having already identified five prospective drilling locations.\n\nRixford Resources LLC, which contributed 35% of the costs of Rost 2, has expressed interest in helping finance further wells.\n\nShould additional joint venture funding be secured, Mendell intends to expand the programme beyond its existing plans.\n\nThe company is also widening its development strategy to examine alternatives to conventional vertical drilling.\n\nOne option involves **recompleting previously shut-in oil and gas wells**, which could provide a faster and more cost-effective route to production while benefiting from existing geological and historical production information.\n\nMendell is additionally studying the feasibility of horizontal and directional drilling, which could increase reservoir contact and allow production from multiple sections of the target formation to be connected to the existing Rost infrastructure.\n\nAlthough horizontal wells would require greater initial investment than individual vertical wells, the company believes they could offer improved economics compared with drilling several separate production wells.\n\nThe feasibility assessment will focus particularly on water disposal performance and the technical challenges of maintaining a horizontal wellbore within a relatively narrow production formation.\n\n**Chief executive Nick Tulloch said the company had successfully demonstrated helium production across three wells in a challenging operating environment**, supporting management’s confidence in its expansion strategy.\n\nTulloch acknowledged that water management and continuing infrastructure development had contributed to inconsistent gas production, but emphasised that the wells had repeatedly returned to production following temporary shutdowns.\n\nHe said Mendell was applying the operational experience gained from its existing wells to its proposed expansion, including the evaluation of alternative drilling techniques and well recompletions.\n\n**The chief executive stressed that Mendell would prioritise sustainable long-term production over short-lived increases in output**, warning that operating pumps too aggressively during early development could compromise well integrity.\n\nThe company remains focused on building a commercially sustainable helium production business in Kansas, supported by its existing infrastructure and a potentially broader pipeline of drilling and recompletion opportunities.\n\n**With three wells demonstrating gas production, high helium concentrations recorded at Rost 2, substantial spare water disposal capacity and funding available for four additional wells, Mendell Helium believes it has established a foundation for further development across the Fort Dodge region.**\n\nHowever, sustained higher production rates at Rost 1 and Schneweis, commercial gas output from Rost 2 and the economics of future drilling projects will remain important measures of operational progress.\n\nMendell said it would provide further updates as its development programme advances."}