{"id":138761,"title":"Kendrick Resources Reports Further High-Grade REE Drill Results at Teufelskuppe","publisher":"Share Talk","author":"sharetalk","published":"2026-07-24T06:33:59+00:00","modified":"2026-07-24T06:34:36+00:00","canonical_url":"https://www.share-talk.com/kendrick-resources-reports-further-high-grade-ree-drill-results-at-teufelskuppe/","markdown_url":"https://www.share-talk.com/kendrick-resources-reports-further-high-grade-ree-drill-results-at-teufelskuppe.md","json_url":"https://www.share-talk.com/kendrick-resources-reports-further-high-grade-ree-drill-results-at-teufelskuppe.json","category":"Mining","categories":["Mining"],"tags":["Bonya Exploration Pty Namibia","Colin Bird","KEN","Kendrick Resources Plc","Kieshöhe","Lüderitz","Namibia","Rare Earth Oxide grades","SW Namibia","Teufelskuppe"],"featured_image":"https://i0.wp.com/www.share-talk.com/wp-content/uploads/2026/03/KEN_with_title_4.webp?fit=1200%2C675&quality=80&ssl=1","format":"news","language":"en-GB","content":"[Kendrick Resources (LON: KEN)](https://www.investegate.co.uk/announcement/rns/kendrick-resources--ken/teufelskuppe-new-drill-results/9685212) reported further encouraging portable X-ray fluorescence results from diamond drilling at the Teufelskuppe rare earth project.\n\nThe latest results cover drill holes TKDD007 to TKDD010 and confirm further high-grade rare earth element mineralisation across substantial downhole widths within the Teufelskuppe carbonatite complex.\n\nThe company said the programme continues to identify broad zones of continuous, near-surface mineralisation.\n\nLight rare earth oxide grades are typically ranging from 2.5% to 3.5% LREO across extensive areas associated with the eight dykes and sills that make up the complex.\n\nDrill hole TKDD010 returned several strong intercepts, including 26 metres at 2.50% LREO from 70 metres and 15 metres at 3.15% LREO from 101 metres.\n\nThe same hole also returned 4 metres at 3.50% LREO from 14.5 metres, 5 metres at 3.45% LREO from 32.25 metres and 7.25 metres at 2.65% LREO from 44.75 metres.\n\nDrill hole TKDD0091 returned 17 metres at 3.25% LREO from 27.75 metres, including 9.5 metres at 4.04% LREO from 35.25 metres.\n\nA second sub-parallel intercept from the redrilled section returned 15.25 metres at 2.39% LREO from 29.75 metres, including 2 metres at 3.31% LREO and 3.75 metres at 3.05% LREO.\n\nDrill hole TKDD007 returned a broad near-surface intercept of 32.75 metres at 1.52% LREO from surface.\n\nDrill hole TKDD008 returned 1.75 metres at 1.60% LREO from 3.0 metres and 1.5 metres at 2.02% LREO from 10.25 metres.\n\nChairman Colin Bird said continuity of mineralisation over impressive widths and strong grades remains a key feature of the Teufelskuppe carbonatite complex.\n\nHe said Kendrick will continue drilling with three rigs as it works to generate sufficient data for a mineral resource estimate in the shortest possible timeframe.\n\nThe company said the use of reverse circulation drilling is helping define the width and extent of individual sills and dykes, allowing the two diamond drill rigs to be positioned more precisely.\n\nPortable XRF results are preliminary in nature and normally require confirmation by laboratory assay, while reported widths are downhole widths unless otherwise stated."}