{"id":117892,"title":"Kavango Resources (LON:KAV) ZIM – Prospect 3 Resource Drilling Commences","publisher":"Share Talk","author":"sharetalk","published":"2024-11-25T07:45:46+00:00","modified":"2024-11-25T07:45:46+00:00","canonical_url":"https://www.share-talk.com/kavango-resources-lonkav-zim-prospect-3-resource-drilling-commences/","markdown_url":"https://www.share-talk.com/kavango-resources-lonkav-zim-prospect-3-resource-drilling-commences.md","json_url":"https://www.share-talk.com/kavango-resources-lonkav-zim-prospect-3-resource-drilling-commences.json","category":"Mining","categories":["Mining"],"tags":["3D geological","airborne","anomalies","Arigo Capital Limited","Belt","Botswana","Brett Grist","COPPER","core","data","David Smith","diamond","Ditau","Drill","electromagnetic","elements","Exploration","geochemistry","Geophysical","Ghanzi Ridge","Jeremy S. Brett","Kalahari","KAV","Kavango Resources","Magnetotelluric","Michael Foster","models","Nickel","Peter Wynter Bee","POW","Power Metal Resources","rare earth","Rwanda","Share Talk","soil","surveys"],"featured_image":"https://i0.wp.com/www.share-talk.com/wp-content/uploads/2024/11/KAV-25-NOV.webp?fit=1200%2C800&quality=80&ssl=1","format":"news","language":"en-GB","content":"**Kavango Resources plc (LSE: KAV)**, the Southern Africa focussed metals exploration company, is pleased to announce the commencement of a drilling programme at its  Prospect 3 target (“Prospect 3”) at the Hillside Gold Project (“Hillside”) in Matabeleland, southern Zimbabwe.\n\nThe drilling programme is designed to delineate a mineral resource to form the basis for an open pit mine, and to obtain sufficient sample to conduct metallurgical test work.\n\nFollowing an in-country strategic review, which included a site visit with the Company’s Technical Team, senior geologists and an international mining engineer, Kavango has ranked Prospect 3 as its priority project in Zimbabwe. The Company believes Prospect 3 has the highest potential to commence commercial production in the shortest amount of time, and with the lowest capital entry.\n\n**Highlights**\n\n·    Kavango has compiled and modelled its geological and geophysical exploration data at Prospect 3 and incorporated mapping of gold producing artisanal workings here. The Company believes this work demonstrates the potential for commercial scale, mechanised open-pit mining and heap leach processing at the prospect.\n\n·    The initial high priority target area averages 200m across strike and 100m along strike, in the vicinity of hole NSDD0002.\n\n·    Artisanal miners are currently producing gold from 12 surface workings with at least 2 different vein orientations, from oxidized meta-sediments above a granodiorite intrusive next to NSDD0002.\n\n·    Hole NSDD002 also intersected an additional 9 grading structures under deeper cover that are currently not being worked.\n\n·    The Company has drilled 3 exploration holes into the target area at Prospect 3. Near-surface highlights from these holes include:\n\no 1.00m @ 1.13 grams per tonne (“g/t”) from 14.00m at Hole NSDD001\n\no 2.00m @ 1.21 g/t from 6.00m at Hole NSDD002\n\no 1.00m @ 1.77 g/t from 13.00m at Hole NSDD002\n\no 8.20m @ 3.08 g/t from 66.69m at Hole NSDD002\n\no 1.00m @ 2.08 g/t from 28.00m at Hole NSDD03\n\n·    Kavango has engaged an international mining engineer, who has extensive experience in modern mining techniques and processes, to oversee the design and construction of the open-pit and heap-leach processing operation at Prospect 3 once the mineral resource has been established.\n\n**Ben Turney, Chief Executive of Kavango Resources, commented:**\n\n“The high level of artisanal workings across Prospect 3 is strongly indicative of the area’s potential for larger scale, near surface gold deposits that Kavango can mine.\n\nThe artisanal workings have focussed on higher-grade material, but to a limited and shallow extent. Our exploration team has identified much more extensive potential, which we will now test with a focussed drill campaign to develop a maiden mineral resource here.\n\nAssuming this drill campaign is successful, we expect to move to a pre-mining, grade control drill campaign and metallurgical test work.\n\n**Geological modelling of Prospect 3**\n\nHole NSDD001 was drilled as a scoping hole to test the grade, width, extent and continuity at depth under extensive and currently gold producing artisanal workings at surface at Prospect 3. Preliminary results for NSDD001 identified multiple gold zones grading at >0.5g/t ([announced >>> 10 May 2024](https://polaris.brighterir.com/public/kavango_resources_plc/news/rns/story/x4j5odx)).\n\nSubsequently, the Company drilled Holes NSDD002 and NSDD003 to further test continuity along strike of the gold mineralisation encountered in NSDD001. NSDD002 was drilled 200m along strike from NSDD001 and NSDD003 was drilled as an infill hole, spaced at 100m in between the first two holes. Both NSDD002 and NSDD003 demonstrated continuation of the gold mineralisation along 200m strike and intercepted multiple gold-bearing zones ([announced >>> 16 September 2024](https://polaris.brighterir.com/public/kavango_resources_plc/news/rns/story/wv378zr)).\n\nFollowing receipt of the assay results from NSDD002 and NSDD003, Kavango’s technical team has completed a thorough compilation and review of historic and current data available to it from Prospect 3. The technical team has modelled the geological and geophysical data and outlined a target area approximately 800m in length and 200m wide (350m at its widest and 45m at its narrowest). The target area is open along strike to both the NW and SE. The target appears to contain multiple wide zones of gold mineralisation grading >0.5 g/t, with narrower high-grade zones where contract artisanal miners are currently producing gold from 12 surface workings with at least 2 different vein orientations, from oxidized meta-sediments above a granodiorite next to NSDD0002.\n\nThe Company believes these zones of gold mineralisation are close enough to surface to represent a possible open-pit gold deposit.\n\nIn addition, Hole NSDD0002 also identified an additional 9 grading structures that the contract artisanal miners at Hillside have not yet discovered.\n\nOn Tuesday 15 October, Kavango conducted a site visit to Prospect 3 with the Company’s Technical Team, senior geologists and an international mining engineer to review the ground and latest contract artisanal workings.\n\nThe extensive gold producing artisanal workings have been typically mined only to a depth of less than 10m at Prospect 3 and are restricted to the shallow oxidised material within the meta-sediments. Kavango believes these contract artisanal workings and completed exploration holes demonstrate the potential for commercial scale mechanised selective open-pit mining at Prospect 3. The highest-grade, near surface intercepts from the three holes include:\n\no 1.00m @ 1.13 g/t from 14.00m at Hole NSDD001\n\no 2.00m @ 1.21 g/t from 6.00m at Hole NSDD002\n\no 1.00m @ 1.77 g/t from 13.00m at Hole NSDD002\n\no 8.20m @ 3.08 g/t from 66.69m at Hole NSDD002\n\no 1.00m @ 2.08 g/t from 28.00m at Hole NSDD03\n\n![](https://dw6uz0omxro53.cloudfront.net/3239388/25df552f-0b7f-4bf1-9fdf-b3742004f522.jpg)\n\nFigure 1: Map of Prospect 3 showing structural features together with artisanal workings, completed boreholes and proposed boreholes for initial phase of the TEA study.\n\nTable 1: Selected intersections from completed holes, NSDD001, NSDD002 & NSDD003\n\n|   |   |   |   |   |\n| --- | --- | --- | --- | --- |\n| Hole no. | m From | m To | m Interval | Gold g/t |\n| NSDD001 | 14.00 | 15.00 | 1.00 | 1.13 |\n| NSDD001 | 62.00 | 64.00 | 2.00 | 0.78 |\n| NSDD001 | 90.00 | 90.98 | 0.98 | 0.70 |\n| NSDD001 | 97.00 | 102.00 | 5.00 | 1.68 |\n| incl | 97.00 | 99.00 | 2.00 | 2.29 |\n| NSDD001 | 106.00 | 110.00 | 4.00 | 0.69 |\n| NSDD001 | 115.51 | 116.00 | 0.49 | 2.49 |\n| NSDD001 | 138.00 | 140.00 | 2.00 | 1.24 |\n| NSDD001 | 143.00 | 144.00 | 1.00 | 0.66 |\n| NSDD001 | 148.00 | 159.90 | 11.90 | 0.92 |\n| incl | 148.00 | 148.97 | 0.97 | 2.14 |\n| and | 156.00 | 157.00 | 1.00 | 3.10 |\n| NSDD001 | 181.00 | 181.99 | 0.99 | 0.63 |\n| NSDD001 | 195.00 | 198.00 | 3.00 | 1.03 |\n| NSDD001 | 203.00 | 207.00 | 4.00 | 0.63 |\n| NSDD002 | 0.00 | 3.00 | 3.00 | 0.66 |\n| NSDD002 | 6.00 | 8.00 | 2.00 | 1.21 |\n| NSDD002 | 13.00 | 14.00 | 1.00 | 1.77 |\n| NSDD002 | 21.00 | 27.00 | 6.00 | 0.51 |\n| NSDD002 | 66.69 | 74.89 | 8.20 | 3.08 |\n| including | 68.39 | 68.74 | 0.35 | 13.82 |\n| NSDD002 | 105.00 | 111.10 | 6.10 | 0.85 |\n| NSDD002 | 152.48 | 153.19 | 0.71 | 1.52 |\n| NSDD002 | 196.46 | 197.00 | 0.54 | 0.82 |\n| NSDD002 | 225.87 | 226.87 | 1.00 | 0.63 |\n| NSDD003 | 6.50 | 8.00 | 1.50 | 0.78 |\n| NSDD003 | 13.00 | 15.00 | 2.00 | 0.75 |\n| NSDD003 | 23.80 | 24.50 | 0.70 | 0.79 |\n| NSDD003 | 28.00 | 29.00 | 1.00 | 2.08 |\n| NSDD003 | 31.40 | 32.40 | 1.00 | 0.68 |\n| NSDD003 | 37.00 | 37.40 | 0.40 | 0.79 |\n| NSDD003 | 62.50 | 65.26 | 2.76 | 0.69 |\n| NSDD003 | 104.40 | 109.40 | 5.00 | 1.80 |\n| including | 104.40 | 104.80 | 0.40 | 5.79 |\n| NSDD003 | 123.50 | 125.00 | 1.50 | 0.80 |\n| NSDD003 | 152.00 | 153.00 | 1.00 | 0.58 |\n| NSDD003 | 163.00 | 165.00 | 2.00 | 0.87 |\n| NSDD003 | 193.00 | 195.00 | 2.00 | 1.09 |\n| NSDD003 | 198.44 | 199.00 | 0.56 | 0.75 |\n\n*All thicknesses are downhole intersection thicknesses.\n\nKavango’s technical team believes Prospect 3 has the potential to host a resource , mineable by open-pit, using modern selective mechanised methods with processing of the mineralised material via low capital cost heap leaching methodologies.\n\n**Initiation of open-pit mining and heap leach processing TEA**\n\nKavango’s technical team has outlined a programme to commence open-pit mining and heap leach processing of gold at Prospect 3. This incorporates 4 phases, with each phase being contingent upon successful completion of the preceding stage:\n\n·    Phase 1, now commenced – Initial resource definition drilling comprising a grid of 90m deep diamond core holes over the target area, on a 25m x 50m spacing with the goal of defining an initial resource containing at least 20,000oz of gold at > 0.5 g/t. Samples from this program will be combined with bulk samples from artisanal pits to complete heap leach metallurgical test work. Metallurgical testing will seek to determine the metallurgical recovery of the gold contained in the mineralised material and guide the design of the heap leach.  Selected core samples will also be used for geotechnical testing to aid in the open pit mine design.\n\n·    Phase 2 – Pre-mining grade control drilling will comprise a grid of 14m deep, angled reverse circulation holes over the target resource area, on a 10m x 10m spacing. This program will enable the design of mineable mineralised blocks on the initial open pit benches.\n\n·    Phase 3 – Technical Economic Assessment Study (“TEA”). The TEA will determine the feasibility of open-pit mining and heap leach processing at Prospect 3. The TEA will produce  a mine plan for the open-pit and designs for the processing plant and heap leach pad as well as economic indicators for the project.\n\n·    Phase 4 – Commence mining and gold production.\n\n![](https://dw6uz0omxro53.cloudfront.net/3239388/37faf586-9a04-4d81-9778-fefcee89afd7.png)\n\nFigure 2: Illustrative outline of a typical heap leach process.\n\nProspect 3 has an extensive strike length (>800m) and the first starter pit (Stage 1) would encompass the full strike width (200m) in the vicinity of hole NSDD0002 and indicatively would mine a strike length of around 8% of the total strike length of the deposit. The mining of future pit stages along strike will be planned once Stage 1 is successfully underway.\n\nThe Phase 1 drill program has the aim of better understanding the geology and the controls on economic mineralization at Prospect 3. The goal will be to confirm a maiden geological resource, from which a high confidence mine plan can be prepared.\n\nThe drill program will also fulfil the need to obtain samples to complete a metallurgical test work program. This testing will seek to confirm the viability of the proposed processing method of for the mineralised material at Prospect 3 and determine the achievable recoveries from the planned heap leaching processing methodology. Samples for geotechnical test work will be collected and analysed to enable drill and blast and wall stability optimisations to be completed. The geological data, metallurgical data, and cost data will feed into the Prospect 3 TEA study.\n\nIn parallel to the drilling program, the Kavango team will commence work on permitting and obtaining detailed cost data for the mining, processing, and support functions.\n\nFurther updates will be provided as the project progresses.\n\n**Kavango’s Operations in Zimbabwe**\n\nKavango is exploring for gold deposits in Zimbabwe that have the potential to be brought into production quickly through modern mechanised mining. The Company is targeting both open-pit and underground opportunities.\n\nCurrently, Kavango has two projects on the same greenstone belt, Hillside and Nara.\n\nKavango exercised its option to acquire Hillside in April 2024. Here the Company has two high-priority targets that it hopes to bring into production over the next 18 months; Prospect 3 and Prospect 4. At Prospect 3 Kavango is investigating the potential for an open-pit selective bulk mining operation. Meanwhile, at Prospect 4 Kavango is pursuing a high-grade, underground bulk-minable opportunity.\n\nIn parallel to this, Kavango has an option to acquire the Nara Project that currently runs until the end of June 2025. Here, the Company is exploring for a large-scale, bulk-minable underground deposit at Nara. The primary target zone is around the historic N1 mine, where the Company is assessing the potential to expand artisanal workings at depth and along strike.\n\nFurther information in respect of the Company and its business interests is provided on the Company’s website at [www.kavangoresources.com](http://www.kavangoresources.com) and on Twitter at #KAV.\n\nFor further information please contact:\n\nKavango Resources plc\n\nBen Turney\n\n+46 7697 406 06"}