{"id":137843,"title":"Italian gas project reaches new milestone for Prospex","publisher":"Share Talk","author":"sharetalk","published":"2026-06-29T09:02:10+00:00","modified":"2026-06-29T09:02:10+00:00","canonical_url":"https://www.share-talk.com/italian-gas-project-reaches-new-milestone-for-prospex/","markdown_url":"https://www.share-talk.com/italian-gas-project-reaches-new-milestone-for-prospex.md","json_url":"https://www.share-talk.com/italian-gas-project-reaches-new-milestone-for-prospex.json","category":"Energy","categories":["Energy"],"tags":["El Romeral","gas","Italy","onshore","Po Valley Energy","Podere Gallina","Poland","Prospex Energy","PVE","PXEN","Selva","Selva Malvezzi","Selva Malvezzi licence","Share Talk","Spain","Tarba Energía","Tom Reynolds"],"featured_image":"https://i0.wp.com/www.share-talk.com/wp-content/uploads/2026/06/GbNmUelWEAAm21V.webp?fit=750%2C406&quality=80&ssl=1","format":"news","language":"en-GB","content":"[Prospex Energy PLC (AIM: PXEN)](https://www.investegate.co.uk/announcement/rns/prospex-energy--pxen/italy-production-concession-update-eia-lodged/9640591) has moved a step closer to expanding production at its Selva Malvezzi gas field in northern Italy after its project partner lodged the Environmental Impact Assessment (EIA) for a planned four-well development programme.\n\nOperator Po Valley Operations, a wholly owned subsidiary of Po Valley Energy, has submitted the application to Italy’s Ministry of Environment and Energy Security, marking a key regulatory milestone for the next phase of development at the concession. Prospex holds a **37% working interest** in Selva Malvezzi, while Po Valley owns the remaining **63%**.\n\nThe proposed drilling programme targets four new production wells located close to the existing Podere Maiar-1 well, which has been producing continuously since July 2023 at approximately **80,000 standard cubic metres of gas per day**.\n\nAlongside the permitting process, processing of a **140 square kilometre 3D seismic survey** is expected to be completed during July, with interpretation commencing immediately afterwards. The updated subsurface model will be used to optimise well locations once regulatory approval is granted.\n\nIf approved, drilling is expected to begin during **2027**, with the development designed to unlock additional gas reserves within the Selva Malvezzi concession. The project benefits from its proximity to Italy’s national SNAM gas pipeline, providing a straightforward route to market while supporting energy security in the Emilia-Romagna region.\n\n**Chief executive Tom Reynolds** said the EIA submission follows months of detailed technical work by the operator and represents another significant milestone towards unlocking the full value of the Selva concession.\n\nThe development would build on existing production infrastructure and, if successful, further strengthen Prospex’s portfolio of producing European natural gas assets."}