---
title: "Hurricane Energy PLC (LON:HUR) Operational Update"
publisher: "Share Talk"
author: "sharetalk"
published: "2020-03-27T08:42:57+00:00"
modified: "2020-03-27T08:42:57+00:00"
date: 2020-03-27
canonical: "https://www.share-talk.com/hurricane-energy-plc-lonhur-operational-update-3/"
category: "Energy"
categories: ["Energy"]
tags: ["HUR", "Hurricane Energy"]
image: "https://i0.wp.com/www.share-talk.com/wp-content/uploads/2023/11/Stencil-Google-Chrome-2023-04-19-at-2.47.43-PM.jpeg?fit=1231%2C615&quality=89&ssl=1"
format: "news"
language: "en-GB"
---

# Hurricane Energy PLC (LON:HUR) Operational Update

**Published:** March 27, 2020
**Author:** sharetalk
**Categories:** Energy
**Tags:** HUR, Hurricane Energy
**Featured image:** ![](https://i0.wp.com/www.share-talk.com/wp-content/uploads/2023/11/Stencil-Google-Chrome-2023-04-19-at-2.47.43-PM.jpeg?fit=1231%2C615&quality=89&ssl=1)

---

Hurricane Energy plc confirms that a crew member on the Aoka Mizu floating production storage and offloading vessel (“FPSO”) at the Lancaster field has been evacuated to the mainland for medical reasons and subsequently tested positive for COVID-19.

The evacuated individual was transported onshore by an HM Coastguard helicopter and is now receiving medical treatment.

Hurricane is supporting Bluewater Lancaster Production (UK) Ltd (“Bluewater”), installation operator of the Aoka Mizu FPSO, with its response. Bluewater is working within the guidelines provided by NHS Scotland, Health Protection Scotland, and Oil and Gas UK in determining the next steps. Production operations at Lancaster have not been affected.

---

**Original URL:** https://www.share-talk.com/hurricane-energy-plc-lonhur-operational-update-3/
*Created by [WP Markdown Endpoint](https://wpmarkdownendpoint.com/)*
