{"id":139476,"title":"GreenRoc Advances Amitsoq Drilling and Ships Pilot Plant Purification Line","publisher":"Share Talk","author":"sharetalk","published":"2026-08-13T08:58:07+00:00","modified":"2026-08-13T08:58:07+00:00","canonical_url":"https://www.share-talk.com/greenroc-advances-amitsoq-drilling-and-ships-pilot-plant-purification-line/","markdown_url":"https://www.share-talk.com/greenroc-advances-amitsoq-drilling-and-ships-pilot-plant-purification-line.md","json_url":"https://www.share-talk.com/greenroc-advances-amitsoq-drilling-and-ships-pilot-plant-purification-line.json","category":"Mining","categories":["Mining"],"tags":["ALBA","Alba Min Res","Alba Mineral Resources","Amitsoq","Bulk Sampling","Clogau","Clogau-St David","George Frangeskides","Gold","Graphite","Greenland","GreenRoc Strategic Materials Plc","GreenRoc Mining","GROC","IPO","Island","Jim Wynn","Kirk Adams","Lars Brünner","Llechfraith Pipeline","Mark Austin","Mine","Share Talk","Spin-Out","Stefan Bernstein","titanium","Underground Drilling"],"featured_image":"https://i0.wp.com/www.share-talk.com/wp-content/uploads/2026/08/a8fb224b-912d-4918-bf54-2cd7d2382475.png?fit=1725%2C912&quality=80&ssl=1","format":"news","language":"en-GB","content":"[GreenRoc Strategic Materials (AIM: GROC)](https://www.investegate.co.uk/announcement/rns/greenroc-strategic-materials-plc--groc/amitsoq-update-/9719034) has reported progress across its **Amitsoq graphite project in Greenland** and its downstream active anode material pilot plant in Denmark.\n\nEquipment for the pilot plant’s **purification line is now being shipped from the US to Denmark**, with delivery to GreenRoc’s Hørsholm facility expected by the end of September. The equipment will support work aimed at demonstrating production of battery-grade active anode material in Europe.\n\nMeanwhile, **Phase III drilling at Amitsoq** has completed three holes, all intersecting significant graphite mineralisation. The latest hole, AM_DD_043, intersected the Lower Graphite Layer with a **true thickness of 21.3 metres**, extending known mineralisation further north.\n\nEarlier holes returned **9.7m of true thickness** in the Lower Graphite Layer, while AM_DD_040 intersected 4.8m in the Upper Graphite Layer and 9.2m in the Lower Graphite Layer.\n\nGreenRoc expects to complete the drilling and technical data required to begin its **Pre-Feasibility Study later this year**.\n\nThe company has also begun working with the **European Investment Bank’s InvestEU Advisory Hub**, which has produced initial drafts of a market analysis and economic model covering GreenRoc’s proposed integrated graphite mine and active anode material business.\n\nChief executive Stefan Bernstein said the combination of substantial drill intersections, pilot plant progress and EIB advisory work was strengthening the company’s integrated **mine-to-AAM development strategy**."}