{"id":110134,"title":"Data from 88 Energy’s Alaska project has exceeded expectations, according to the broker.","publisher":"Share Talk","author":"sharetalk","published":"2023-09-21T15:32:50+00:00","modified":"2023-09-21T15:32:50+00:00","canonical_url":"https://www.share-talk.com/data-from-88-energys-alaska-project-has-exceeded-expectations-according-to-the-broker/","markdown_url":"https://www.share-talk.com/data-from-88-energys-alaska-project-has-exceeded-expectations-according-to-the-broker.md","json_url":"https://www.share-talk.com/data-from-88-energys-alaska-project-has-exceeded-expectations-according-to-the-broker.json","category":"Energy","categories":["Energy"],"tags":["88 Energy","88 ENERGY LIMITED","88e","Alaska","Arctic","Dave Wall","David Wall","Farm-Out","FOX","ICEWINE","Merlin-1","North Slope","North Slope of Alaska","oil","Peregrine","Permian Basin","Project Icewine","Project Peregrine","RIG","Rig 111","Share Talk","Snow road","Texas","U.S"],"featured_image":"https://i0.wp.com/www.share-talk.com/wp-content/uploads/2023/11/Stencil-Google-Chrome-2023-04-19-at-2.47.43-PM.jpeg?fit=1231%2C615&quality=89&ssl=1","format":"news","language":"en-GB","content":"The Upper Slope Fan System (Upper SFS) of **88 Energy Ltd’s (AIM:88E, ASX:88E, OTC: EMF)** Project Phoenix covers a broader area than initially indicated, as revealed in a recent Cavendish research note.\n\nThe updated mapping spans a distance of over four miles and is linked with considerable oil prospects, as confirmed by the Icewine-1 well, mentioned by the company’s broker.\n\nCavendish also highlighted that the Upper SFS showcased some of the most optimal reservoir conditions during the drilling phase, with porosities hitting as high as 16%.\n\nThis optimistic scenario complements the previously pinpointed 647 million barrels of potential oil resources before the start of drilling.\n\nIn related news, 88 Energy is all set for flow testing at another site, Hickory-1.\n\nThey’ve secured a drilling rig, with test drills potentially starting in the early months of 2024. Anticipated resource estimates for the Upper SFS are on the horizon, aiming to shed more light on the project’s capabilities."}