---
title: "Critical Metals Starts 2026 Molulu Field Programme"
publisher: "Share Talk"
author: "sharetalk"
published: "2026-10-02T08:28:17+00:00"
modified: "2026-10-02T08:28:17+00:00"
date: 2026-10-02
canonical: "https://www.share-talk.com/critical-metals-starts-2026-molulu-field-programme/"
category: "Mining"
categories: ["Mining"]
tags: ["Critical Metals plc", "CRTM", "Danilo Lange", "Democratic Republic of Congo", "geological mapping", "Molulu Copper & Cobalt Project", "Sampling", "surveying", "trenching"]
image: "https://i0.wp.com/www.share-talk.com/wp-content/uploads/2026/10/cb44e4a9-dce1-4eb9-9da4-97ed00b890df.png?fit=1727%2C911&quality=80&ssl=1"
format: "news"
language: "en-GB"
---

# Critical Metals Starts 2026 Molulu Field Programme

**Published:** October 2, 2026
**Author:** sharetalk
**Categories:** Mining
**Tags:** Critical Metals plc, CRTM, Danilo Lange, Democratic Republic of Congo, geological mapping, Molulu Copper & Cobalt Project, Sampling, surveying, trenching
**Featured image:** ![](https://i0.wp.com/www.share-talk.com/wp-content/uploads/2026/10/cb44e4a9-dce1-4eb9-9da4-97ed00b890df.png?fit=1727%2C911&quality=80&ssl=1)

---

[Critical Metals plc (LON: CRTM)](https://www.investegate.co.uk/announcement/rns/critical-metals--crtm/commencement-of-field-work/9803047)has commenced its **2026 field programme at the Molulu Copper/Cobalt Project in the Democratic Republic of Congo**, following programme approval, funding release and mobilisation.

The programme has begun within the company’s stated **1-8 October 2026 operational window**.

Personnel and equipment have been mobilised, while site preparation is under way, **subject to final site confirmation**.

Initial work will focus on **surveying, geological mapping, trenching and sampling**, supported by quality assurance and quality control procedures and subsequent integration of the resulting data.

The purpose of the programme is to improve Critical Metals’ understanding of the mineralised areas and assess whether the initial target is suitable for **scout mining**.

Chief executive **Danilo Lange** said the company’s immediate priority is to establish whether the target can support that next stage of activity, with the decision dependent on the results of the current field programme.

Molulu is a historically producing copper-cobalt project located in the **Katangan Copperbelt**, approximately 100 kilometres from Lubumbashi.

The company said the current programme is intended to provide greater visibility on the distribution and characteristics of mineralisation before determining the next operational steps.

For investors, the key distinction is that **Critical Metals has started exploration and target-definition work, not scout mining itself**.

The next material update will therefore be the **initial field findings following data validation and technical review**, which should indicate whether the identified target justifies progressing towards scout mining.

**Investor takeaway: ***Critical Metals has started its 2026 field programme at the Molulu copper-cobalt project in the DRC, with surveying, mapping, trenching and sampling now under way. The work is designed to determine whether the initial target can support scout mining, so the key next catalyst is the validated field data rather than any immediate production milestone.*

---

**Original URL:** https://www.share-talk.com/critical-metals-starts-2026-molulu-field-programme/
*Created by [WP Markdown Endpoint](https://wpmarkdownendpoint.com/)*
