Caracal Gold PLC, the expanding East African gold producer with over 1,300,000oz of JORC compliant gold resources, is pleased to confirm ongoing delivery of high-grade ore from the high-grade zone in the Kilimapesa Hill deposit to the Milling plant.

Highlights

· Ongoing 360tpd of high-grade material with average grades from 3.39g/t to 4.92g/t being processed,

· The initial mining plan has been extended to over 180 days of delivery of high-grade material to the milling plant ,

· Exploration to define the full potential of the high-grade zone in ongoing. 

The average grades for the period from 19th March to 28th March 2023 are detailed below:

Date

Average Grade

19-Mar

3.49g/t

20-Mar

3.68g/t

21-Mar

3.94g/t

22-Mar

3.55g/t

23-Mar

3.73g/t

24-Mar

4.92g/t

25-Mar

4.15g/t

26-Mar

3.65g/t

27-Mar

3.51g/t

28-Mar

3.39g/t

 Hourly belt cuts are taken on the mill feed conveyor and the daily summary sampling sheets for samples are attached. These samples are assayed in the Kilimapesa laboratory. Sampling and analytical procedures are subject to a comprehensive quality assurance and quality control program. The QAQC program involves insertion of duplicate samples, blanks and certified reference materials in the sample stream. Gold analyses are performed by standard fire assaying protocols using a 50-gram charge with atomic absorption (AAS) finish and a gravimetric finish performed for assays greater than 10 grams per tonne.

Tonnages mined improved to over 400tpd from the high-grade zone, recoveries remained in line at 75%, the  plant availability was affected by power outages after pole on the main feed line to plant collapsed during a heavy rainstorm – plant availability for the period was 75%.

Robbie McCrae, CEO of Caracal commented:

“It has been 20 days since we started mining and processing ore from the Kilimapesa Hill high-grade zone and the team are pleased with the results across the board from the exploration to the mining and to the processing. The mining team have worked hard to complete the access roads and strip waste and now are focussed on increasing the tonnage mined and delivered to the Milling plant. At the Milling plant the focus Is to increase the tonnage from 360tpd to 500tpd over the next few weeks. We are looking forward to updating the market on the results from the exploration work on the high-grade zone in the near future”.

 * * ENDS * *

For further information visit www.caracalgold.com or contact the following:

 

Caracal Gold plc

Robbie McCrae

[email protected]


Linking Shareholders and Executives :Share Talk

If anyone reads this article found it useful, helpful? Then please subscribe www.share-talk.com or follow SHARE TALK on our Twitter page for future updates. Terms of Website Use All information is provided on an as-is basis. Where we allow Bloggers to publish articles on our platform please note these are not our opinions or views and we have no affiliation with the companies mentioned

Weekly Newsletter

Sign up to receive exclusive stock market content in your inbox, once a week.

We don’t spam! Read our privacy policy for more info.

Tweet
WhatsApp
Email
Pocket
Share
Share