{"id":143188,"title":"Angus Energy restores Saltfleetby gas production as Brockham","publisher":"Share Talk","author":"sharetalk","published":"2026-11-19T10:49:08+00:00","modified":"2026-11-19T10:49:08+00:00","canonical_url":"https://www.share-talk.com/angus-energy-restores-saltfleetby-gas-production-as-brockham/","markdown_url":"https://www.share-talk.com/angus-energy-restores-saltfleetby-gas-production-as-brockham.md","json_url":"https://www.share-talk.com/angus-energy-restores-saltfleetby-gas-production-as-brockham.json","category":"Energy","categories":["Energy"],"tags":["ANGS","Angus Energy","Angus Energy PLC","Balcombe","Brockham","Brockham Oil Field","BRX4-Z","BRX4Z well","David Haughie","export","gas","George Lucan","inert","Jason Joannou","Kimmeridge","line","National Grid","nitrogen","Portland","reservoir","Richard Herbert","Royal Dutch Shell","Saltfleetby","Share Talk","Shell Energy","system","Theddlethorpe","transmission","Well"],"featured_image":"https://i0.wp.com/www.share-talk.com/wp-content/uploads/2026/11/bddfc218-e91e-4ae7-a371-ff32b1186cf7.png?fit=1727%2C911&quality=80&ssl=1","format":"news","language":"en-GB","content":"[Angus Energy PLC (AIM: ANGS)](https://www.investegate.co.uk/announcement/rns/angus-energy--angs/saltfleetby-production-and-brockham-update-/9882989) has restored stable production at its Saltfleetby Gas Field after resolving a compressor instrumentation fault, while preparations for a planned workover at its Brockham Oil Field have been completed ahead of delayed rig mobilisation.\n\nThe company confirmed that **Saltfleetby production had been approximately 7% below forecast over the past month** following repeated unexpected shutdowns of the field’s booster compressor.\n\nAn investigation identified an instrumentation fault responsible for the interruptions, which has now been corrected.\n\n**Gas production has returned to stable levels in line with management’s expectations**, with further optimisation work continuing to improve operating performance.\n\nThe resolution removes a source of recent disruption at Saltfleetby, although Angus has not disclosed updated production volumes or quantified the financial impact of the temporary shortfall.\n\nAt the **Brockham Oil Field**, preparations for the planned **BRX4Z well workover** have been completed, but the start of operations has been postponed because the contracted rig remains engaged on another assignment.\n\nAngus said the delay was outside its control and that the company was ready to begin work once the equipment becomes available.\n\n**The BRX4Z workover is expected to commence in the coming weeks**, subject to the rig’s release and successful mobilisation to Brockham.\n\nThe company has not provided a confirmed start date or updated production expectations for the well.\n\n**The restoration of Saltfleetby production represents a positive operational development for Angus Energy**, while the Brockham programme remains dependent on third-party rig availability.\n\nThe next milestones will be **sustained gas production at Saltfleetby and commencement of the BRX4Z workover**, with Angus planning to provide a further update once operations begin at Brockham.\n\nFor further information please visit [www.angusenergy.co.uk](http://www.angusenergy.co.uk/)."}