{"id":98056,"title":"Angus Energy PLC (AIM:ANGS) Progress Update at Saltfleetby","publisher":"Share Talk","author":"sharetalk","published":"2022-06-14T16:18:29+00:00","modified":"2022-06-14T16:18:29+00:00","canonical_url":"https://www.share-talk.com/angus-energy-plc-aimangs-progress-update-at-saltfleetby/","markdown_url":"https://www.share-talk.com/angus-energy-plc-aimangs-progress-update-at-saltfleetby.md","json_url":"https://www.share-talk.com/angus-energy-plc-aimangs-progress-update-at-saltfleetby.json","category":"Energy","categories":["Energy"],"tags":["ANGS","Angus Energy","Brockham","BRX4-Z","David Haughie","George Lucan","Jason Joannou","Kimmeridge","Portland","reservoir","Royal Dutch Shell","Saltfleetby","Share Talk","Shell Energy","Well"],"featured_image":"https://i0.wp.com/www.share-talk.com/wp-content/uploads/2023/11/Stencil-Google-Chrome-2023-04-19-at-2.47.43-PM.jpeg?fit=1231%2C615&quality=89&ssl=1","format":"news","language":"en-GB","content":"**Angus Energy (AIM: ANGS)** is pleased to announce that in accordance with the timings announced on 10 June all welding and hydrotesting of lines requiring inspection under the Pressure Equipment Safety Regulations has been completed and the site has been significantly de-manned with scaffolding removed from the pipe-rack.\n\nA handful of lower category lines remain to be hydrotested without inspection this week.\n\nThe next and final stage in proving mechanical integrity will be to introduce nitrogen into the plant for a five-day leak and pressure test which we expect to commence at the end of this week. Meanwhile the electrical – power and control and instrumentation – installation continues at pace.\n\nEND.\n\n**Enquiries:**\n\nAngus Energy Plc\n\n[www.angusenergy.co.uk](http://www.angusenergy.co.uk)\n\nGeorge Lucan\n\nTel: +44 (0) 208 899 6380"}