Forgent plc (AIM: FORG) has reported new copper assay results from its 99%-owned Peak Hill Gold-Copper Project in Western Australia, with drilling at the central Curley’s prospect intersecting 9 metres at 0.45% copper, including a higher-grade section of 5 metres at 0.60% copper.
The results from the company’s Phase II drilling programme, completed in September 2026, confirm the presence of both gold and copper mineralisation within the central discovery area.
Drill hole CAC008 returned 9 metres grading 0.45% copper from 43 metres downhole, including 5 metres at 0.60% copper from 46 metres. Within the wider intersection, copper grades reached 0.69% over a one-metre interval.
The latest results follow previously announced gold intersections at Curley’s, including 7 metres at 2.32 grams per tonne (g/t) gold from 26 metres in drill hole CAC010, reported on 5 November 2026.
Forgent confirmed that it has now received all multi-element assay results from the initial 30-hole Phase II programme, covering 1,406 metres of drilling.
The strongest copper intersections came from drilling in the central section of Curley’s, where 12 holes were assessed.
Drill hole CAC009, located approximately 13 metres north of CAC008, intersected 2 metres at 0.16% copper from 48 metres, providing further evidence of copper mineralisation at a similar downhole depth.
The remaining holes returned lower copper grades.
The latest findings also build on results from an earlier Phase I drill hole nearby, which returned 18 metres at 0.24% copper from 48 metres, as announced on 28 August 2026.
Forgent said the repeated copper intersections across successive drilling programmes had strengthened its understanding of mineralisation in the central Curley’s area.
Five consecutive metres in CAC008 each returned copper grades above 0.50%, highlighting the higher-grade portion of the latest intersection.
The company is continuing an extensive follow-up drilling campaign aimed at investigating the extent and continuity of gold mineralisation across the prospect.
Forgent has completed 40 holes totalling 3,031 metres out of its current 55-hole drilling programme at central Curley’s, with the first batch of 3,420 samples already submitted to the laboratory for analysis.
The programme is targeting approximately 600 metres of strike length, with the objective of establishing how far the previously identified gold mineralisation extends.
Drilling at Curley’s is expected to conclude by the end of November 2026, after which the rig will relocate to the western section of the Cathedral prospect.
A further 15 drill holes are planned at Cathedral, targeting the area between Forgent’s PKAC119 drill hole and the historical EFAC2007 intersection.
The historical hole, located approximately 230 metres northwest of PKAC119, returned 5 metres at 2.07g/t gold from 35 metres downhole, as announced on 19 November 2026.
The planned drilling will investigate whether gold mineralisation extends continuously between the two locations.
Following completion of the Cathedral programme, the drilling rig is expected to demobilise for the festive break.
Chief executive James Parsons welcomed the confirmation of copper mineralisation alongside the previously reported gold results, highlighting the progress achieved through consecutive exploration programmes.
Parsons said the shallow gold intersections had provided a clear focus for follow-up drilling, while copper results from CAC008 supported the earlier discovery of mineralisation in the same area.
He noted that the company had now intersected copper in two successive drilling programmes, building on the 18-metre intersection reported in August.
Parsons also highlighted the pace of the current campaign, with 40 of the 55 planned Curley’s holes completed and 3,420 samples undergoing laboratory analysis.
The company’s immediate objective is to determine the extent of gold mineralisation along the 600-metre strike being investigated.

