88 Energy Limited (88E.ASX.L) For the quarter ended 30 September 2021

88 Energy Limited (ASX:88E, AIM:88E, OTC:EEENF) (88 Energy or the Company) provides the following report for the quarter ended 30 September 2021.

Highlights

Project Peregrine (100% WI)

· Presence of oil exhibited in multiple stacked sequences of the Merlin-1 well.

· Geochemical analysis demonstrates definitive evidence of light oil, with an estimated API gravity between mid-30s to low-40s.

· Project Peregrine prospective resource estimates updated by independent consultant, ERCE.

· Merlin-2 appraisal well planned for Q1 2022 with permitting and rig selection underway.

· Three potential Merlin-2 locations selected to the east of Merlin-1, where enhanced reservoir thickness and quality are expected.

· Merlin-2 targeting net mean aggregate prospective resource of 652 million barrels1.

Umiat Oil Field (100% WI)

· Further studies, including Merlin-1 well analysis, have identified additional upside at Umiat.

· Approval from BLM to defer Umiat Year 2 Unit well commitment by 24 months to 31 August 2023.

· Deferral facilitates optimisation of full field development plan, including evaluation of potential synergies with Project Peregrine.

Project Icewine (75% WI)

· Internal analysis of Pantheon Resources’ nearby Talitha-A well results continues; initial studies indicate potential for extension onto Project Icewine acreage.

· Reassessment of prospective resource potential across Project Icewine acreage is underway.

Yukon Leases (100% WI)

· Discussions advanced with nearby lease owners seeking to aggregate resources into a joint development of the area.

· Planning for future potential exploration drilling is ongoing – subject to farm-out and joint development negotiations.

Corporate

· Board and management team strengthened.

· Strong financial position – cash of A$36.1M and zero debt (as at 30 September 2021).

1. Mean unrisked resource – Net Entitlement to 88 Energy. Please refer to cautionary statement on page 2.

Project Peregrine (100% WI)

Merlin-1 Exploration Well

The Merlin-1 well was spudded in March 2021, targeting 645 million barrels of net mean aggregate prospective resource. 88 Energy announced on 16 August 2021 that post well evaluation had successfully demonstrated the presence of oil in multiple stacked sequences in the Cretaceous Nanushuk Formation (N20 and N18 targets). An additional new, unmapped target, the N19 sand, also returned a strong hydrocarbon signature following geochemical analysis.

Wireline analysis and core data correlate to 41 feet of net log pay across the three reservoir intervals. In addition, results of the post well formation evaluation, including core and Reservoir Description Tool (RDTTM) data, determined the presence of moveable hydrocarbons. Geochemical analysis of the cores has determined the presence of a light oil with an estimated API gravity between mid-30s to low-40s.

Given the up-dip location of the Merlin-1 well with respect to the N20, N19 and N18 reservoirs, hydrocarbon shows and sand quality at this location was consistent with pre-drill expectations. 88 Energy has identified appraisal drilling locations to the east of the Merlin-1 well, closer to the shelf break, where enhanced reservoir thickness and quality are expected.

Post well analysis also determined that a targeted Merlin-1 well horizon, the N14, was not intersected and is believed to lie below the total depth of the well. The N14 prospect remains a target of interest and the Merlin-1 well may be re-entered to test this prospective target as part of the Company’s future drilling activities at Project Peregrine.

Independent oil and gas reservoir evaluation consultancy, ERCE Australia Pty Ltd (ERCE), conducted an updated assessment of the Project Peregrine prospective resources. The updated prospective resource estimates and risking assessments for Project Peregrine are contained in the table below.

Cautionary Statement: The estimated quantities of petroleum that may be potentially recovered by the application of a future development project relate to undiscovered accumulations. These estimates have both an associated risk of discovery and a risk of development. Further exploration, appraisal and evaluation are required to determine the existence of a significant quantity of potentially movable hydrocarbons.

1. Please refer to the ASX release dated 16 August 2021 for full details with respect to the Prospective Resource estimate, associated risking and applicable Cautionary Statement.

Merlin-2 Appraisal Well

The Merlin-2 appraisal well is planned for Q1 2022, targeting a net mean aggregate prospective resource of 6521 million barrels in the N20, N19 and N18 horizons. Permitting and rig selection for Merlin-2 is currently underway. The Company recently completed a capital raise for the Merlin-2 well, however, may also consider a farm-out to a strategic partner if terms are suitably attractive.

In July 2021, 88 Energy completed the acquisition of the residual 50% working interest in Project Peregrine from APDC, moving to its current 100% working interest.

1. Mean unrisked resource – Net Entitlement to 88 Energy. Please refer to cautionary statement on page 2.

Umiat Oil Field (100% WI)

During Q1 2021, 88 Energy acquired the Umiat Oil Field. As part of the acquisition, the Company received the Umiat data pack which includes Umiat 3D seismic data. The Umiat 3D survey abuts the southern edge of the Project Peregrine lease blocks. Integrating the Linc/Malamute seismic interpretation has provided a better understanding of the Peregrine reservoir geometries to the north as well as enriching our petrophysical database with additional well control (Umiat-8 and Umiat-23H).

The Merlin-1 well at Project Peregrine penetrated a thick section of Grandstand sands (Umiat reservoir unit). Wireline data collected over this interval is being analysed and integrated with the Umiat dataset. Preliminary pressure analysis suggests there is potential for bypassed pay in the footwall of the Umiat structure.

The Umiat footwall has only been penetrated by one well (Umiat-11), which was drilled in 1952 with a crude logging and testing program. Seismic attribute analysis suggests there is potential for additional reservoir sands in the footwall of the Umiat structure.

Project Icewine (75% WI)

88 Energy has been closely monitoring activity proximate to the northern border of its Project Icewine acreage, where the Kuparuk has been reported from the Talitha-A well drilled earlier this year by Pantheon Resources (see AIM:PANR release dated 19 April 2021).

Additional insight into the wettability of the Kuparuk formation have also been highlighted from the results of the Talitha-A program, which may have positive implications for the same formation in88 Energy’s Icewine acreage.

All three wells drilled by 88 Energy at Project Icewine have encountered good quality reservoir in the Kuparuk formation, with indications of hydrocarbons. These had previously been interpreted as likely gas condensate or residual oil, and no mapped targets had been identified as this was not a play that 88 Energy had been pursuing.

The results at Talitha-A are highly encouraging regionally for the Kuparuk, including across Project Icewine. Given the results from the Talitha-A well, 88 Energy’s internal geoscience team is reassessing the potential across the acreage.

Yukon Leases (100% WI)

The Yukon Leases contain the 86 million barrel1 Cascade Prospect, which was intersected peripherally by Yukon Gold-1 and classified as an historic oil discovery.

In 2018, 88 Energy acquired 3D seismic over Cascade and, post analysis, high-graded it from a lead to a drillable prospect. The Yukon Leases are located adjacent to ANWR and in proximity to recently commissioned infrastructure at Point Thompson.

Discussions advanced with nearby lease owners during the quarter with respect to a joint development area. Future exploration drilling planning is ongoing and remains subject to farm-out and other discussions.

1 Refer to 88 Energy release dated 7th November 2018. Note cautionary statement on page 2.

Corporate

On 2 August 2021, Mr Michael Evans retired from the 88 Energy Board and Mr Philip Byrne was appointed as Non-Executive Chairman. Ms Joanne Kendrick was also appointed as a Non-Executive Director.

Mr Robert Benkovic joined 88 Energy in the role of Chief Operating Officer (COO) during the quarter.

On 2 September 2021, 88 Energy announced that it has successfully completed a bookbuild to domestic and international institutional and sophisticated investors to raise A$23.96 million (before costs) through the issuance of 855,856,369 shares at a price of A$0.028 per share, all of which were issued under the Company’s 15% Placement Capacity under ASX Listing Rule 7.1.

Funds raised under the placement, together with the Company’s existing cash reserves, are to be used to fund the planned Merlin-2 appraisal well, broader acreage lease payments and working capital, and to enable identification and execution of potential new project opportunities.

Finance

The ASX Appendix 5B attached to this quarterly report contains the Company’s cash flow statement for the quarter. The significant cash flows for the period were:

· Exploration and evaluation expenditure totalled A$4.9M gross (June 2021 quarter: A$11.7M), primarily associated with expenditure on Project Peregrine Merlin-1 well drilling and post well testing;

· Lease rental payments totalled A$2.4M;

· Cash call proceeds received from Joint Venture partners totalled A$6.7M (June 2021 quarter A$5.9M); and

· Administration and other operating costs, net of government payments, totalled A$0.48M and staff costs totalled A$0.26M. Note, this included fees paid to Directors in the quarter of $164,456 and Director consulting fees of $12,955.

At quarter end, the Company had cash reserves of A$36.1M and no debt.

ESG

On 30 June 2021, 88 Energy announced the adoption of the Environmental, Social and Governance (ESG) framework developed by the World Economic Forum (WEF). 88 Energy is committed to building its ESG credentials and making ESG disclosures against the WEF stakeholder capitalism framework. These disclosures can be found in the ESG section of 88 Energy’s website https://www.88energy.com/88-energy-esg-reporting/.

Since implementing the ESG framework, 88 Energy has made the following progress:

· Renewal of 88 Energy’s Board with Mr Philip Byrne joining 88 Energy as non-executive Chairman and Ms Joanne Kendrick joining 88 Energy as non-executive director. The addition of both Mr Byrne and Ms Kendrick brings significant international oil and gas experience, with a broad range of skillsets, to the Board.

· Gender diversity in the workforce; the 88 Energy gender mix has improved from 91% Male / 9% Female in 2020 to 64% Male / 36% Female as at the end of Q3 2021.

· Integration of a detailed sustainability framework and reporting into exploration and corporate activities.

Table 2: Information required by ASX Listing Rule 5.4.3

Pursuant to the requirements of the ASX Listing Rules Chapter 5 and the AIM Rules for Companies, the technical information and resource reporting contained in this announcement was prepared by, or under the supervision of, Dr Stephen Staley, who is a Non-Executive Director of the Company. Dr Staley has more than 35 years’ experience in the petroleum industry, is a Fellow of the Geological Society of London, and a qualified Geologist / Geophysicist who has sufficient experience that is relevant to the style and nature of the oil prospects under consideration and to the activities discussed in this document. Dr Staley has reviewed the information and supporting documentation referred to in this announcement and considers the prospective resource estimates to be fairly represented and consents to its release in the form and context in which it appears. His academic qualifications and industry memberships appear on the Company’s website and both comply with the criteria for “Competence” under clause 3.1 of the Valmin Code 2015. Terminology and standards adopted by the Society of Petroleum Engineers “Petroleum Resources Management System” have been applied in producing this document.

This announcement has been authorised by the Board.

88 Energy Ltd

Ashley Gilbert, Managing Director

Tel: +61 8 9485 0990

Email:[email protected]


Linking Shareholders and Executives :Share Talk

If anyone reads this article found it useful, helpful? Then please subscribe www.share-talk.com or follow SHARE TALK on our Twitter page for future updates. Terms of Website Use All information is provided on an as-is basis. Where we allow Bloggers to publish articles on our platform please note these are not our opinions or views and we have no affiliation with the companies mentioned